CityMA
Posted
Aug 29, 2026
Oct 2, 2026
Three Phase Padmount Transformers (Request for Proposal)
Three phase padmount transformers.
Description: The scope of the work includes but is not limited to Base Bid: Structural repairs at all existing steel columns in gymnasium, CMU and brick masonry work, and hazardous materials abatement. Add Alternate No. One: Removal and replacement of H.M. doors and frames, removal and replacement of metal porches and concrete work, associated re-grading for positive drainage, removal of various interior CMU walls and fixtures.
School · AL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMA
Posted
Aug 29, 2026
Oct 2, 2026
Three phase padmount transformers.
Colorado Northwestern Community College
Higher EducationCO
Posted
-
Sep 14, 2026
Work includes excavate and provide minimal stormwater management around the three affected walls, investigate and repair walls and door thresholds within the building, and restore finishes.
Special DistrictTN
Posted
May 29, 2026
Sep 4, 2026
4 EA, tr pw 3p 24/32/40mva 69:23. 9x13. 8kv three phase, outdoor, power transformer, onan rating: 24 mva @ maximum 55 degrees c rise, i. E. 24/32/40//44. 8 mva, 55//65 degrees c rise. Voltage: 69 kv delta-- 23. 9/13. 8 x 13. 8/7. 967 kv grounded wye (dual voltage secondary). Impedence: 7. 2% at 13. 8 kv, based on rated voltage and oa rating.
Gainesville Regional Utilities (GRU)
Special DistrictFL
Posted
Aug 11, 2026
Sep 9, 2026
Gainesville Regional Utilities is soliciting sealed bids for the annual purchase of three-phase pad-mounted transformers. The transformers will be supplied on an as-needed basis in accordance with GRU’s approved Electric Distribution System standards and technical specifications. Bids are due September 9, 2026, at 2:00 p.m. Eastern Time, with questions due September 2, 2026, at 4:00 p.m. Eastern Time.
Decision makers connected to this RFP from Francis Marion School.