Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Eatonton-Putnam Water And Sewer Authority
In general, construction shall consist of installation of approximately 2,800 LF water main in total. The main size will be 8”. The project includes installation of fire hydrants, clearing and grubbing, gravel driveway removal/replacement, and asphalt removal/replacement for impacted areas. Also, silt fences and mulch will be used for erosion and sediment control.
Posted Date
Jan 30, 2026
Due Date
Mar 5, 2026
Release: Jan 30, 2026
Eatonton-Putnam Water And Sewer Authority
Close: Mar 5, 2026
In general, construction shall consist of installation of approximately 2,800 LF water main in total. The main size will be 8”. The project includes installation of fire hydrants, clearing and grubbing, gravel driveway removal/replacement, and asphalt removal/replacement for impacted areas. Also, silt fences and mulch will be used for erosion and sediment control.
AvailableEatonton-Putnam Water And Sewer Authority
Work includes approx 400 LF 8" watermain, fifteen (15) 3-way fire hydrant assemblies, Four (4) 3-way fire hydrant replacements, and excavation around a hydrant perimeter. Also, the project includes removal of existing fire hydrants, installation curb and gutter removal/replacement, sidewalk removal/replacement, and asphalt removal/replacement for impacted areas and service transfers. New hydrants shall be AFC B84B with Storz connection on 5 1/4" pumper connection. See attached file.
Posted Date
Feb 19, 2025
Due Date
Mar 27, 2025
Release: Feb 19, 2025
Eatonton-Putnam Water And Sewer Authority
Close: Mar 27, 2025
Work includes approx 400 LF 8" watermain, fifteen (15) 3-way fire hydrant assemblies, Four (4) 3-way fire hydrant replacements, and excavation around a hydrant perimeter. Also, the project includes removal of existing fire hydrants, installation curb and gutter removal/replacement, sidewalk removal/replacement, and asphalt removal/replacement for impacted areas and service transfers. New hydrants shall be AFC B84B with Storz connection on 5 1/4" pumper connection. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Eatonton-Putnam Water And Sewer Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Eatonton-Putnam Water And Sewer Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database