Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
East Goshen Township
Project Involves cured-in-place pipelining of ±4,483 L.F. of 8-inch diameter asbestos cement gravity sewer pipe.
Posted Date
Mar 13, 2026
Due Date
Apr 3, 2026
Release: Mar 13, 2026
East Goshen Township
Close: Apr 3, 2026
Project Involves cured-in-place pipelining of ±4,483 L.F. of 8-inch diameter asbestos cement gravity sewer pipe.
AvailableEast Goshen Township
Provide Tree Pruning & Tree Removal services.
Posted Date
-
Due Date
Mar 5, 2026
Release: -
East Goshen Township
Close: Mar 5, 2026
Provide Tree Pruning & Tree Removal services.
East Goshen Township
Milling machines without operators (two): 1) 1. 3-mtr-wide milling drum. Shall be capable of milling next to vertical curb. Milling depth shall be adjustable from a minimum of 0" to 12". 2) milling machine will have a 7'x2 wide milling head with a self-loading conveyor. The milling machine shall have a front-loading conveyor. The conveyer shall be covered and shall be capable of loading a dump truck that has a tail gate height of 12'. The milling machine shall be equipped with a water system for dust control.
Posted Date
Jan 14, 2026
Due Date
Jan 29, 2026
Release: Jan 14, 2026
East Goshen Township
Close: Jan 29, 2026
Milling machines without operators (two): 1) 1. 3-mtr-wide milling drum. Shall be capable of milling next to vertical curb. Milling depth shall be adjustable from a minimum of 0" to 12". 2) milling machine will have a 7'x2 wide milling head with a self-loading conveyor. The milling machine shall have a front-loading conveyor. The conveyer shall be covered and shall be capable of loading a dump truck that has a tail gate height of 12'. The milling machine shall be equipped with a water system for dust control.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than approximately $23,800, use sole source.
Coops: Ask to purchase via COSTARS or Sourcewell to bypass formal bidding.
Entity: East Goshen Township (PA).
Evidence: No public record of sole source usage; deprioritize this path.
Board meetings and strategic plans from East Goshen Township
The council discussed water data related to the upcoming Conservancy Board meeting and scheduled a Native Plant seminar. New business items included seeking input on the website, preparations for Community Day, the submission of a summer newsletter article, and findings regarding landscaping waste and composting. Additionally, the council reviewed the results of a high school clothes drive, brainstormed communication strategies for apartment residents, planned for reusable bag distribution at a campout event, and discussed coordinating with the planning commission and attending the Chesco Sustainability Day.
The Commission discussed several new business items, including the distribution and signing of the Code of Ethics, the content of the upcoming Spring Township Newsletter, and proposed park programming such as the 'On The Go' program. They reviewed a proposal for a World Cup event, considered food truck vendor options, and discussed various community events including Senior Wacky Olympics, Amputee Ping Pong, America250 celebrations, and an after-school program for kids. Additionally, the commission reviewed the upcoming ABC Kickoff Meeting regarding the Comprehensive Plan. Old business items included updates on EGT Park renovations, such as bathroom replacements and volleyball court improvements, and scheduling for ball field openings. Liaison reports highlighted the need for future activity planning for younger demographics.
The meeting addressed sewer system infrastructure, including the inspection and future repair scheduling for SBR tanks and sanitary sewer pipe lining projects in Supplee Valley and Waterview. There were updates on pump station upgrades and grant applications, including the status of Small Water and Sewer Grant applications. The committee reviewed sewer extension progress for Morstein Road, Great Oak Circle, Charter Chase, and Goshen Downs, as well as the status of Chapter 94 Annual Reports and new residential sewer connection inquiries. The board also processed specific invoices for various service providers.
The board reviewed a subdivision proposal for 971 Cornwallis Drive, which involves the development of three homes, stormwater management plans, and necessary tree removal due to invasive species and disease. Additionally, the board discussed the Wood Duck Box project for Applebrook Park, emphasizing maintenance and recording procedures. Other topics included updates on the upcoming bi-annual planning session, Arbor Day event scheduling, the frequency of the organization's newsletter, and confirmation of the Tree City application submission.
The meeting encompassed a review of the Director of Public Works' sewer reports regarding monthly flows, rainfall, and maintenance activities, alongside the Engineer's report covering SBR tank inspections, sanitary sewer pipe rehabilitation, pump station grant statuses, and sewer extension progress. Financial reports for the current year-to-date were presented and reviewed. New business items addressed included the consolidation of the Motor Control Center, authorization of an engineering proposal for the Hunt Country Pump Station project, and the approval of specific capacity requests. Additionally, members were reminded to review and sign the Code of Ethics.
Extracted from official board minutes, strategic plans, and video transcripts.
Track East Goshen Township's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database