Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Dallas County Water And Sewer Authority
Work inlcudes rehabilitation to well no. 1 to include removing and replacing existing high service pumps, chemical feed equipment, filter tank media and appurtenances, aerator, flocculation and sedimentation equipment, sensors, doors, louvers, windows, control systems and rehabilitation to well no. 3 to include removing and replacing filter tank media and appurtenances.
Posted Date
Jun 10, 2026
Due Date
Jun 30, 2026
Release: Jun 10, 2026
Dallas County Water And Sewer Authority
Close: Jun 30, 2026
Work inlcudes rehabilitation to well no. 1 to include removing and replacing existing high service pumps, chemical feed equipment, filter tank media and appurtenances, aerator, flocculation and sedimentation equipment, sensors, doors, louvers, windows, control systems and rehabilitation to well no. 3 to include removing and replacing filter tank media and appurtenances.
AvailableDallas County Water And Sewer Authority
Work includes rehabilitation to five lift stations to include removing and replacing existing submersible pumps, base elbows, discharge piping, guide rails, check valves, isolation valves, and control system, additionally, scada hardware will be installed at each lift station and integrated into the existing scada network. See outside link.
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Dallas County Water And Sewer Authority
Close: Feb 12, 2026
Work includes rehabilitation to five lift stations to include removing and replacing existing submersible pumps, base elbows, discharge piping, guide rails, check valves, isolation valves, and control system, additionally, scada hardware will be installed at each lift station and integrated into the existing scada network. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge