Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
County of Lapeer
Provide hma paving project involving hot mix asphalt surfacing. May require construction experience with asphalt paving, traffic control, and coordination with utilities.
Posted Date
Mar 2, 2026
Due Date
Mar 19, 2026
Release: Mar 2, 2026
County of Lapeer
Close: Mar 19, 2026
Provide hma paving project involving hot mix asphalt surfacing. May require construction experience with asphalt paving, traffic control, and coordination with utilities.
AvailableCounty of Lapeer
Contract 2 consists of improvements to an open channel county drain, including but not limited to: Clearing, snagging, and clearing for excavation along approx. 42 stations of open drain. Excavation of approx. 5,200 CY of open drain material. Hauling, leveling, and disposal of existing and new spoil material and debris. Seeding and fertilizing of approx. 80 stations of disturbed drain right-of-way and leveled spoil areas. Furnishing and installation of approximately nine (9) grade control structures and one (1) side rock chute. Removal and replacement of existing drain crossings in poor or very poor condition, including private and roadway crossings, consisting of removal and disposal of existing culverts and installation of new corrugated steel pipe arch (CSPA) culverts with aluminized coating, including associated appurtenances and restoration.
Posted Date
Jan 23, 2026
Due Date
Feb 24, 2026
Release: Jan 23, 2026
County of Lapeer
Close: Feb 24, 2026
Contract 2 consists of improvements to an open channel county drain, including but not limited to: Clearing, snagging, and clearing for excavation along approx. 42 stations of open drain. Excavation of approx. 5,200 CY of open drain material. Hauling, leveling, and disposal of existing and new spoil material and debris. Seeding and fertilizing of approx. 80 stations of disturbed drain right-of-way and leveled spoil areas. Furnishing and installation of approximately nine (9) grade control structures and one (1) side rock chute. Removal and replacement of existing drain crossings in poor or very poor condition, including private and roadway crossings, consisting of removal and disposal of existing culverts and installation of new corrugated steel pipe arch (CSPA) culverts with aluminized coating, including associated appurtenances and restoration.
County of Lapeer
Improvements, including but not limited to: Installation of approx. 8,200 LF of storm sewer pipe ranging in size from 8" to 42" diameter, consisting of smooth-lined corrugated polyethylene pipe and reinforced concrete pipe. Construction of approx. 90 drainage structures, ranging in size from 24" to 120" dia., including large-diameter and outlet control structures. Construction of underground stormwater detention facilities, including underground storage chambers, excavation of approx. 12,000 CY of earth, handling and hauling of spoils, placement of approx. 7,400 CY of aggregate backfill, and site restoration at multiple locations. Construction of an outlet to an open channel drain, including a rock chute and grade control structure. Clearing and grubbing of drain right-of-way; bulkheading of existing drains and storm sewers; connections to existing drainage systems; utility coordination and adjustments; erosion and sedimentation control; grading; pavement removal and replacement; curb and gutter; sidewalk; driveway restoration; pavement markings; lawn restoration; and drain right-of-way restoration. Division 2 consists of incidental municipal watermain work along Pleasant Street and associated improvements, including but not limited to. Abandonment of existing watermain, installation of approx. 470 LF of new 8" watermain, water services, associated drainage improvements, pavement restoration, and appurtenances.
Posted Date
Jan 23, 2026
Due Date
Feb 24, 2026
Release: Jan 23, 2026
County of Lapeer
Close: Feb 24, 2026
Improvements, including but not limited to: Installation of approx. 8,200 LF of storm sewer pipe ranging in size from 8" to 42" diameter, consisting of smooth-lined corrugated polyethylene pipe and reinforced concrete pipe. Construction of approx. 90 drainage structures, ranging in size from 24" to 120" dia., including large-diameter and outlet control structures. Construction of underground stormwater detention facilities, including underground storage chambers, excavation of approx. 12,000 CY of earth, handling and hauling of spoils, placement of approx. 7,400 CY of aggregate backfill, and site restoration at multiple locations. Construction of an outlet to an open channel drain, including a rock chute and grade control structure. Clearing and grubbing of drain right-of-way; bulkheading of existing drains and storm sewers; connections to existing drainage systems; utility coordination and adjustments; erosion and sedimentation control; grading; pavement removal and replacement; curb and gutter; sidewalk; driveway restoration; pavement markings; lawn restoration; and drain right-of-way restoration. Division 2 consists of incidental municipal watermain work along Pleasant Street and associated improvements, including but not limited to. Abandonment of existing watermain, installation of approx. 470 LF of new 8" watermain, water services, associated drainage improvements, pavement restoration, and appurtenances.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from County of Lapeer
Key discussions included the recommendation to authorize the hiring of a Veterans Services Officer at Step 1, based on the candidate's extensive qualifications and certifications, with a step re-evaluation planned after one year. The committee also recommended approving a change to the CMH Table of Organization to eliminate the vacant Triage/MICCS Clinical Coordinator position and create a full-time Intake/DBT Supervisor position to meet new Region 10 requirements, noted as budget-neutral for the County General Fund. Furthermore, the committee recommended amending the recently adopted Paid Vacation Policy to set the effective date for all new full-time non-union employees hired on or after January 1, 2025.
This five-year Parks & Recreation Plan serves as a strategic guide for the management and development of parks, recreational lands, and open spaces across Lapeer County. It outlines priorities and goals to ensure long-term stewardship, enhance public access, and meet the evolving needs of residents and visitors. The plan focuses on four key areas: operating existing facilities sustainably, increasing planning and development for new opportunities, fostering intergovernmental cooperation, and preserving natural features, open space, and farmland, including addressing underserved areas within the county.
The full board meeting included opening ceremonies with prayer and the pledge of allegiance. Agenda amendments were approved, including the addition of motions from the Properties Committee meeting. Discussions covered the approval of minutes from the previous regular board meeting, which included an amendment regarding the Lapeer County Separation Policy and related addendums. The board authorized Central Dispatch to purchase Dell computers for compliance, and approved an increase in monthly service fees for county-provided internet services, effective January 1, 2026. Approvals were also granted for the construction contract for the remodeling of the county building located at 1505 Suncast Drive, and for the release of a Request for Bid (RFB) for household hazardous waste collection events. Motions were passed to authorize contracts for the historic courthouse flooring restoration project and to upgrade the Sofa Central email protection subscription. The board also initiated the Request for Proposal (RFP) process for the construction of a new Community Mental Health (CH) building and authorized engagement letters for legal counsel and financial advisory services related to the CH bond project. Several board appointments were confirmed across various committees, including the Central Dispatch Authority 911 Board, the Community Mental Health Board, the Emergency Management Advisory Council (EMAC), and the Valley Area on Aging (VAOA). Finally, the payment of mileage expense reimbursement for a commissioner and the approval of county and road commission audits were addressed.
The Personnel Committee agenda was approved, and the minutes from the October 9, 2025 meeting were approved. Discussions included authorizing the District Court to provide one week of paid overlap training for a new Court Clerk I due to staff shortages, primarily related to criminal case docket training. The committee also authorized the Prosecuting Attorney's Office to hire one transitional Prosecuting Intern (December 1, 2025 – June 1, 2026) and one temporary traditional Prosecuting Intern (December 1, 2025 – September 1, 2026), both paid from the Prosecutor's budget. Furthermore, the Committee recommended approval of the revised Lapeer County Compensation and Transfer policy to the Committee of the Whole, and approved designating the Chairman of the Board of Commissioners as the authorized plan signer for MERS to expedite plan changes. The Health Department received authorization to hire a candidate for the vacant Public Health Nurse I position at Step 1 based on extensive experience. Finally, the County Administrator was authorized to research and negotiate with MERS regarding establishing a minimum employment requirement for future MERS eligibility. The committee also agreed to adjust future meeting dates to Mondays or Wednesdays.
The meeting commenced with the call to order, role call establishing a quorum, opening prayer, and the pledge of allegiance. Key discussions included the approval of the agenda and the minutes from the October 23rd regular board meeting. Elected officials and department heads provided updates. The Sheriff discussed the aftermath of an officer-involved shooting, detailing the independent investigation by the State Police, the justification of the deputies' actions, and the ongoing care for the suspect. An update on Community Corrections funding for FY26 was provided, noting an increase in award despite increased county participation and delays in contract finalization. Public time addressed proposed county-wide camera installation, raising Fourth Amendment and privacy concerns, and also included commentary on the reappointment of a member to the Lapeer District Library Board of Trustees.
Extracted from official board minutes, strategic plans, and video transcripts.
Track County of Lapeer's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across County of Lapeer's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database