Rispin Eight Pillar Arbor Project RFP
Aug 18, 2026
Closes
Sep 1, 2026
Work consists of layout and excavation; reinforced-concrete footings; fabrication and construction of eight columns and the overhead trellis; associated structural connections and finishes; installation of six iceberg roses; and restoration of areas disturbed by construction.
