Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Clay County Utility Authority
Clay County Utility Authority (CCUA) is seeking sealed bids from qualified bidders for well repair, maintenance, and ancillary services under Invitation for Bid No. 2025/2026-A04. The scope of work requires the bidder to provide all necessary labor, materials, and equipment to perform well repair and maintenance services for CCUA's water infrastructure. CCUA currently serves more than 50,000 customers in Clay County, Florida, and operates and maintains twenty-two water treatment plants, seven water reclamation facilities, and nine reclaimed storage and pumping facilities, making this contract essential to the utility's ongoing operations.
Posted Date
Jul 2, 2026
Due Date
Jul 27, 2026
Release: Jul 2, 2026
Clay County Utility Authority
Close: Jul 27, 2026
Clay County Utility Authority (CCUA) is seeking sealed bids from qualified bidders for well repair, maintenance, and ancillary services under Invitation for Bid No. 2025/2026-A04. The scope of work requires the bidder to provide all necessary labor, materials, and equipment to perform well repair and maintenance services for CCUA's water infrastructure. CCUA currently serves more than 50,000 customers in Clay County, Florida, and operates and maintains twenty-two water treatment plants, seven water reclamation facilities, and nine reclaimed storage and pumping facilities, making this contract essential to the utility's ongoing operations.
AvailableClay County Utility Authority
Provide CCUA odor control products and services.
Posted Date
Jun 22, 2026
Due Date
Jun 29, 2026
Release: Jun 22, 2026
Clay County Utility Authority
Close: Jun 29, 2026
Provide CCUA odor control products and services.
Clay County Utility Authority
Provide 8"dr 11 hdpe with blue stripe, 6" cast iron cement lined, 6"dr 18 c900 pvc blue, blue locate wire (six 500ft rolls), 8" x 8" hdpe adapters to mj, 8"x 6" mj reduces cement lined, 3ft bury hydrants, 6" rs valves, 6"mj fire hydrant tee s, 6" bell restraints, 6 pvc fitting restraints, 6" mj kits less glands, 8" mj kits with glands, 8" pvc fitting restraints, 6" mj sleeves cement lined, 6" x 2"mj tap caps, 18" to 24" valve box water lids, 6" x 1.5" tap saddle, 6"x 1" tap saddle, 6" x 2" tap saddle, 2" arv valve for water main, 1.5" blue poly, 1" blue poly.
Posted Date
May 14, 2026
Due Date
May 21, 2026
Release: May 14, 2026
Clay County Utility Authority
Close: May 21, 2026
Provide 8"dr 11 hdpe with blue stripe, 6" cast iron cement lined, 6"dr 18 c900 pvc blue, blue locate wire (six 500ft rolls), 8" x 8" hdpe adapters to mj, 8"x 6" mj reduces cement lined, 3ft bury hydrants, 6" rs valves, 6"mj fire hydrant tee s, 6" bell restraints, 6 pvc fitting restraints, 6" mj kits less glands, 8" mj kits with glands, 8" pvc fitting restraints, 6" mj sleeves cement lined, 6" x 2"mj tap caps, 18" to 24" valve box water lids, 6" x 1.5" tap saddle, 6"x 1" tap saddle, 6" x 2" tap saddle, 2" arv valve for water main, 1.5" blue poly, 1" blue poly.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Clay County Utility Authority
This document outlines the Clay County Utility Authority's long-term strategy for ensuring water sustainability through environment and stewardship initiatives. Key focus areas include transitioning from reliance on the Floridan Aquifer to a diverse portfolio of water sources, specifically through Alternative Water Supply (AWS) planning, which includes projects like Project Quench for potable reuse. It also details stormwater harvesting techniques to reduce aquifer demand and regional partnerships such as the Black Creek Water Resource Development Project. The plan aims to protect the natural environment, secure economic vitality, and provide clean, safe water for future generations through conservation rate structures and innovative technologies.
The meeting was held to engage partners and seek feedback regarding CCUA's 'As-built Specifications Manual and Review Process.' The discussion included why as-builts are kicked back multiple times, the possibility of submitting preliminary as-builts for review prior to final submittal, and the time-consuming nature of converting engineering CAD files to meet CCUA standards. Other topics included the engineers' preference to see all utilities on one sheet, the value of a meeting prior to the project, concerns about the implementation of design CAD standards, the expected review time for as-built reviews, and the inclusion of CCUA website links in the pre-con package and close out document emails. The meeting also addressed the time it takes to approve COC's, the preference between the engineer's title block and CCUA's title block, how contractors and surveyors can help streamline issues, and the requirements for directional drilling projects.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Clay County Utility Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge