Dollar General Lift Station
Aug 26, 2026
Closes
Sep 25, 2026
As part of the project, the current station will remain in place during construction. The upgrades to the system will include a new influent gravity sewer into the wet well, new pumps, piping, and appurtenances will be placed withing the existing wet well but, a new valve vault structure will be installed. The project will also involve the installation of a new electrical system, controls, and an on-site emergency generator. Additionally, the site will gain a curb cut from hwy 321 to the driveway, to improve access and maintenance for city staff. California street pump station will also receive new pumps and electrical components as a part of this project.
