Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Sole Source: Deprioritize—no clear policy published; pivot back to a coop path.
Coops: Lead with Sourcewell. Confirm your product is on a Sourcewell contract and ask them to purchase via their membership to bypass formal bidding.
City of Windsor Heights, IA: There is no publicly available evidence of a sole-source policy or dollar ceiling.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Windsor Heights's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
City Engineer
Public Works Director
City Administrator
Police Chief
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Windsor Heights
The 74th street improvements project includes pavement reconstruction, storm sewer installation and water main replacement.
Posted Date
Jan 9, 2026
Due Date
Feb 10, 2026
Release: Jan 9, 2026
City of Windsor Heights
Close: Feb 10, 2026
The 74th street improvements project includes pavement reconstruction, storm sewer installation and water main replacement.
AvailableCity of Windsor Heights
Work includes limestone stone block bench 4 EA; limestone retaining wall 50 ton; dewatering 1 ls; clearing and grubbing 1 LS; topsoil, on-site 338 CY; excavation, class 10 585 CY; storm sewer, trenched, RCP, 30" 20 LF; storm sewer, trenched, RACP, 51x31" 16 LF; removal of storm sewer, RCP 32 LF; pipe apron, RCP, 30" 1 EA; pipe apron, RCAP, 51X31" 1 EA; footing for concrete pipe apron, RCP, 30" 1 EA; footing for concrete pipe apron, RCAP, 51X31" 1 EA; pipe apron guard, 30" 1 EA; pipe apron guard, 51x31" 1 EA; removal of shared use path 75 SY; shared use path, PCC, 6" 75 SY; sidewalk, PCC, 5" 260 SY; temporary traffic control 1 LS; traffic signs 2 EA. See attached file.
Posted Date
Sep 16, 2025
Due Date
Oct 29, 2025
Release: Sep 16, 2025
City of Windsor Heights
Close: Oct 29, 2025
Work includes limestone stone block bench 4 EA; limestone retaining wall 50 ton; dewatering 1 ls; clearing and grubbing 1 LS; topsoil, on-site 338 CY; excavation, class 10 585 CY; storm sewer, trenched, RCP, 30" 20 LF; storm sewer, trenched, RACP, 51x31" 16 LF; removal of storm sewer, RCP 32 LF; pipe apron, RCP, 30" 1 EA; pipe apron, RCAP, 51X31" 1 EA; footing for concrete pipe apron, RCP, 30" 1 EA; footing for concrete pipe apron, RCAP, 51X31" 1 EA; pipe apron guard, 30" 1 EA; pipe apron guard, 51x31" 1 EA; removal of shared use path 75 SY; shared use path, PCC, 6" 75 SY; sidewalk, PCC, 5" 260 SY; temporary traffic control 1 LS; traffic signs 2 EA. See attached file.
City of Windsor Heights
The project consists of installation of storm sewer including storm sewer abandonment and removal, pipe and intake installation, PPC pavement, and sodding. Work includes topsoil, on-site 18 CY; storm sewer, trenched, 24" 73 LF; removal of storm sewer, RCP, 15" 47 LF; storm sewer abandonment, fill and plug, 15" 425 LF; subdrain pop up outlet 2 EA; intake, nyloplast 30" 2 EA; manhole adjustment, minor 1 EA; connection to existing manhole 1 EA; remove intake 2 EA; removal of sidewalk 20 SY; removal of driveway 40 SY; sidewalk, PCC 4" 20 SY; sidewalk, PCC, 6" 7 SY; detectable warning 10 SF; driveway, paved, PCC, 6" 40 SY; full depth patches, PCC, 9" 170 SY; temporary traffic control 1 LS. See attached file.
Posted Date
May 20, 2025
Due Date
Jun 10, 2025
Release: May 20, 2025
City of Windsor Heights
Close: Jun 10, 2025
The project consists of installation of storm sewer including storm sewer abandonment and removal, pipe and intake installation, PPC pavement, and sodding. Work includes topsoil, on-site 18 CY; storm sewer, trenched, 24" 73 LF; removal of storm sewer, RCP, 15" 47 LF; storm sewer abandonment, fill and plug, 15" 425 LF; subdrain pop up outlet 2 EA; intake, nyloplast 30" 2 EA; manhole adjustment, minor 1 EA; connection to existing manhole 1 EA; remove intake 2 EA; removal of sidewalk 20 SY; removal of driveway 40 SY; sidewalk, PCC 4" 20 SY; sidewalk, PCC, 6" 7 SY; detectable warning 10 SF; driveway, paved, PCC, 6" 40 SY; full depth patches, PCC, 9" 170 SY; temporary traffic control 1 LS. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.