Water Service Meter Replacement RFP
Aug 10, 2026
Closes
Aug 28, 2026
Work includes: Replace 130 of the city's existing .75" residential meters and 10 1.5"commercial meters; relocate existing backflow devices to new meter boxes; install new .75" double check backflow devices and meter boxes on residential services with current lack.
