Yamhill St NE Sewer Cured-in-Place Liner RFP
Posted
Oct 29, 2026
Nov 12, 2026
Work includes installation of approx., 1,876 LF of cured in place liner within a 15" reinforced concrete pipe from manhole 57 to manhole 63. Work also includes bypassing sewer flow from manhole to manhole, cleaning the pipe before installation, and providing a televising recording if the installation. Grouting and epoxy coating of 7 manholes will also occur.


