Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $25,000, use sole source—however, avoid sole source; approvals are rare and generally limited to emergencies.
Coops: Start with a cooperative: confirm availability on Sourcewell or OMNIA; validate with the City Manager’s office; proceed if approved.
Entity: City of Sheridan, OR.
Posture: Extreme aversion to non-competitive awards; only one emergency instance on record. Deprioritize.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Sheridan's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
City Engineer
City Manager
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Sheridan
Application for Community Development Grants available to non-profits and for-profit entities serving the Sheridan community.
Posted Date
Jul 1, 2025
Due Date
Jun 9, 2026
Release: Jul 1, 2025
City of Sheridan
Close: Jun 9, 2026
Application for Community Development Grants available to non-profits and for-profit entities serving the Sheridan community.
AvailableCity of Sheridan
Construction of a 140 SY asphalt river access trail, 3,654 SF 4" concrete pavement for 5' wide concrete sidewalk to connect an existing stairwell on the east side to a public parking lot.
Posted Date
Jun 23, 2025
Due Date
Jul 24, 2025
Release: Jun 23, 2025
City of Sheridan
Close: Jul 24, 2025
Construction of a 140 SY asphalt river access trail, 3,654 SF 4" concrete pavement for 5' wide concrete sidewalk to connect an existing stairwell on the east side to a public parking lot.
City of Sheridan
Sheridan Road Waterline Improvements Project Alignment: The new improvements route begins at the intersection of S Bridge Street and SE Hope Court and continues southeast along Sheridan Road to SE Hope Court. The new PVC pipe will be installed via open trench under the existing roadway and sidewalk. Water Distribution Improvements: The project scope includes all work and materials related to the construction of approx. 4,100 LF of new 14" PVC waterline, transitions sections of 4", 6" and 10" new waterline, and installation of waterline fittings and valving, fire hydrant assemblies, blow-off hydrant assembles, air release assembles, and 68 reconnections to existing water service piping. Waterline installation will require pipe bedding and backfill with compaction efforts, AC trench patching, and includes waterline and material testing and other miscellaneous items required for a complete installation. Sanitary Sewer Improvements: Approx. 4,000 LF of 8, 12, and 15" Cured in Place Pipe lining (CIPP) shall be installed along the project alignment. The project scope includes Furnishing all labor, equipment and materials as required for the complete installation of CIPP liner on the existing gravity sewer. Complete installation of the new facilities shall include, but not be limited to potholing and locating the existing sewer lines and laterals, interim construction of bypass pumping, installment of CIPP liner and landscape restoration and clean up.
Posted Date
Jun 28, 2024
Due Date
Jul 25, 2024
Release: Jun 28, 2024
City of Sheridan
Close: Jul 25, 2024
Sheridan Road Waterline Improvements Project Alignment: The new improvements route begins at the intersection of S Bridge Street and SE Hope Court and continues southeast along Sheridan Road to SE Hope Court. The new PVC pipe will be installed via open trench under the existing roadway and sidewalk. Water Distribution Improvements: The project scope includes all work and materials related to the construction of approx. 4,100 LF of new 14" PVC waterline, transitions sections of 4", 6" and 10" new waterline, and installation of waterline fittings and valving, fire hydrant assemblies, blow-off hydrant assembles, air release assembles, and 68 reconnections to existing water service piping. Waterline installation will require pipe bedding and backfill with compaction efforts, AC trench patching, and includes waterline and material testing and other miscellaneous items required for a complete installation. Sanitary Sewer Improvements: Approx. 4,000 LF of 8, 12, and 15" Cured in Place Pipe lining (CIPP) shall be installed along the project alignment. The project scope includes Furnishing all labor, equipment and materials as required for the complete installation of CIPP liner on the existing gravity sewer. Complete installation of the new facilities shall include, but not be limited to potholing and locating the existing sewer lines and laterals, interim construction of bypass pumping, installment of CIPP liner and landscape restoration and clean up.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.