Schaller Drinking Water Improvements Raw Water Main RFP
Posted
Sep 15, 2026
Oct 15, 2026
Project consists of but not limited to approx. 60 CY Topsoil, on site; 280 LF Raw Water Main, Trenched, RJ DIP, Class 52, w/ Nitrile Gaskets, 6"; 405 LF Raw Water Main, Trenchless, RJ DIP, Class 52, W/ Nitrile Gaskets, 6"; 615 LB Fittings by Weight, Ductile Iron; 1 EA Valve, Gate, 6"; 1 EA Flushing Device (Blowoff), 2"; 25 SY Removal of PCC Sidewalk; 65 SY Removal of Granular Driveway; see Estimate Project Quantities (p5) for mote details.