Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Rockaway Beach's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Finance Director
Public Works Director
City Manager
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Rockaway Beach
The City of Rockaway Beach invites sealed bids for the Nedonna Beach Water Main Improvements, including installation of new 8-inch water mains and associated appurtenances along Beach Drive, Nedonna Avenue, Section Line Street, and an additive on Geneva Avenue. Bids are due by 2:00 p.m. on February 19, 2026, with a mandatory pre-bid conference at 1:00 p.m. on February 10, 2026, at City Hall. Bid documents are available from HBH Consulting Engineers, with digital downloads via QuestCDN.
Posted Date
Jan 30, 2026
Due Date
Feb 19, 2026
Release: Jan 30, 2026
City of Rockaway Beach
Close: Feb 19, 2026
The City of Rockaway Beach invites sealed bids for the Nedonna Beach Water Main Improvements, including installation of new 8-inch water mains and associated appurtenances along Beach Drive, Nedonna Avenue, Section Line Street, and an additive on Geneva Avenue. Bids are due by 2:00 p.m. on February 19, 2026, with a mandatory pre-bid conference at 1:00 p.m. on February 10, 2026, at City Hall. Bid documents are available from HBH Consulting Engineers, with digital downloads via QuestCDN.
AvailableCity of Rockaway Beach
Project consists of the construction of a new water main, storm drain, sanitary sewer main, and a road asphalt overlay, and includes furnishing all materials, labor, equipment, supervision, and testing for the complete construction of: Water Improvements including approximately 2550 linear feet of 8” C900 PVC water main, 63 water service connections, 4 new fire hydrant assemblies, and a blow off valve. Storm Improvements including 5 new 24” catch basins and approximately 330 linear feet of 8” and 12” D3034 PVC Storm Pipe. Sanitary Sewer Improvements including 3 new manholes, a pipe offset joint repair, and a service connection. Street Improvements including approximately 1,600 tons of asphalt paving including trench patching, grind and inlay, and overlay of approximately 3/4 mile of roadway, including driveway and street transitions and adjusting manholes, cleanouts, and catch basins. All work under this Contract must be substantially completed within 180 days of the Notice to Proceed.
Posted Date
Jul 23, 2025
Due Date
Aug 13, 2025
Release: Jul 23, 2025
City of Rockaway Beach
Close: Aug 13, 2025
Project consists of the construction of a new water main, storm drain, sanitary sewer main, and a road asphalt overlay, and includes furnishing all materials, labor, equipment, supervision, and testing for the complete construction of: Water Improvements including approximately 2550 linear feet of 8” C900 PVC water main, 63 water service connections, 4 new fire hydrant assemblies, and a blow off valve. Storm Improvements including 5 new 24” catch basins and approximately 330 linear feet of 8” and 12” D3034 PVC Storm Pipe. Sanitary Sewer Improvements including 3 new manholes, a pipe offset joint repair, and a service connection. Street Improvements including approximately 1,600 tons of asphalt paving including trench patching, grind and inlay, and overlay of approximately 3/4 mile of roadway, including driveway and street transitions and adjusting manholes, cleanouts, and catch basins. All work under this Contract must be substantially completed within 180 days of the Notice to Proceed.
City of Rockaway Beach
The work under this Contract will include the replacement of the City’s Primary Sludge and Trickling Filter Recirculation Pumps at the City’s Wastewater Treatment Plant. Valves shall be ordered and installed as shown on the plans and electrical system shall be replaced in kind from the service disconnect switch through the pump.
Posted Date
Mar 5, 2025
Due Date
Mar 20, 2025
Release: Mar 5, 2025
City of Rockaway Beach
Close: Mar 20, 2025
The work under this Contract will include the replacement of the City’s Primary Sludge and Trickling Filter Recirculation Pumps at the City’s Wastewater Treatment Plant. Valves shall be ordered and installed as shown on the plans and electrical system shall be replaced in kind from the service disconnect switch through the pump.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.