Palo Community Center HVAC Controls (Replacement Request for Quotations)
Jul 28, 2026
Closes
Aug 28, 2026
Replacement and upgrade of HVAC control systems including controllers, sensors, programming, commissioning, and system integration; Remove existing controllers for 2 (two) ERVs and replace with new CGM/XPM controllers. Verify Fire Alarm Shutdown Relay. Provide Point to Point Device Verification. Program & Commission ERV sequence (Use existing sequence for reference); Remove existing controllers for 9 (nine) Heat Pumps and replace with new CGM/XPM controllers; Provide point to point and device verification. Replace temperature/humidity sensors; Program and Commission HP sequence (Use existing sequence for reference); Remove existing controller for pumps, glycol fill and generator, replace with CGM/XPM controller. Program & Commission sequence Use existing sequence for reference), verify burglar alarm operation; Provide 3 (three) new temperature sensors for vestibule heater and fire pump room heater. Install new SNE supervisory controller (owner to provide data drop and IP address); Integrate existing field devices, (VAVs, UG, Hx Etc.); Build New Floor Plans, Basic MUI Graphics; Verify alarm configuration and reporting; Verify Trending Reuse existing devices, actuators, and data groups; Includes low voltage control wiring, programming and checkout All work to be performed within normal business hours.
