FederalMT
Jul 29, 2026
Closes
Aug 20, 2026
HVAC Replacement NWS WFO in Mobile, AL (Request for Quotations)
HVAC replacement.
Description: Replacement and upgrade of HVAC control systems including controllers, sensors, programming, commissioning, and system integration; Remove existing controllers for 2 (two) ERVs and replace with new CGM/XPM controllers. Verify Fire Alarm Shutdown Relay. Provide Point to Point Device Verification. Program & Commission ERV sequence (Use existing sequence for reference); Remove existing controllers for 9 (nine) Heat Pumps and replace with new CGM/XPM controllers; Provide point to point and device verification. Replace temperature/humidity sensors; Program and Commission HP sequence (Use existing sequence for reference); Remove existing controller for pumps, glycol fill and generator, replace with CGM/XPM controller. Program & Commission sequence Use existing sequence for reference), verify burglar alarm operation; Provide 3 (three) new temperature sensors for vestibule heater and fire pump room heater. Install new SNE supervisory controller (owner to provide data drop and IP address); Integrate existing field devices, (VAVs, UG, Hx Etc.); Build New Floor Plans, Basic MUI Graphics; Verify alarm configuration and reporting; Verify Trending Reuse existing devices, actuators, and data groups; Includes low voltage control wiring, programming and checkout All work to be performed within normal business hours.
City · IA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to City of Palo.
Adjacent opportunities open for bidding right now.
FederalMT
Jul 29, 2026
Closes
Aug 20, 2026
HVAC replacement.
Jul 30, 2026
Closes
Aug 14, 2026
Replacement of greenhouse environmental control system.
FederalMD
Aug 4, 2026
Closes
Aug 14, 2026
Replace the cooling and heating coils.
Jul 24, 2026
Closes
Aug 10, 2026
Provide and install a 4 ton split system at the Saleeby Center. The contractor must also remove and dispose of the old HVAC unit. See attached file.