Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Mebane
The City of Mebane, North Carolina is soliciting sealed bids for the Office/Shop Renovations and Storage Building Addition to the Mebane Public Works facility located at 636 Corregidor Street. The base bid covers construction of a new office (Room #104) in Building #1 with steel column foundations, concrete floor, metal stud walls, acoustical ceiling, finishes, split-system A/C, and electrical work. Two alternates are included: a 117 sq ft lobby renovation in Building #1, and a one-story 2,440 sq ft pre-engineered metal building addition to Building #2. Bids are due at 2:00 PM EDT on July 23, 2026, with a non-mandatory pre-bid meeting on July 14, 2026; Alley, Williams, Carmen & King, Inc. is the project architect.
Posted Date
Jul 2, 2026
Due Date
Jul 23, 2026
Release: Jul 2, 2026
City of Mebane
Close: Jul 23, 2026
The City of Mebane, North Carolina is soliciting sealed bids for the Office/Shop Renovations and Storage Building Addition to the Mebane Public Works facility located at 636 Corregidor Street. The base bid covers construction of a new office (Room #104) in Building #1 with steel column foundations, concrete floor, metal stud walls, acoustical ceiling, finishes, split-system A/C, and electrical work. Two alternates are included: a 117 sq ft lobby renovation in Building #1, and a one-story 2,440 sq ft pre-engineered metal building addition to Building #2. Bids are due at 2:00 PM EDT on July 23, 2026, with a non-mandatory pre-bid meeting on July 14, 2026; Alley, Williams, Carmen & King, Inc. is the project architect.
AvailableCity of Mebane
The proposed work consists of storm drainage repairs in various locations within the City. The proposed work includes; installation of cast-in-place headwalls, installation of 18" and 48" storm pipe, rap-rap pads and other incidental work to improve storm drainage.
Posted Date
Apr 30, 2026
Due Date
May 22, 2026
Release: Apr 30, 2026
City of Mebane
Close: May 22, 2026
The proposed work consists of storm drainage repairs in various locations within the City. The proposed work includes; installation of cast-in-place headwalls, installation of 18" and 48" storm pipe, rap-rap pads and other incidental work to improve storm drainage.
City of Mebane
This RFP seeks proposals from qualified firms for a Water Tank Asset Maintenance Program, including engineering, professional management, cellular site management, inspection, rehabilitation, repairs, washouts, water stratification eliminations, safety devices, visual inspections, and coating of water storage tanks.
Posted Date
Apr 16, 2026
Due Date
May 20, 2026
Release: Apr 16, 2026
City of Mebane
Close: May 20, 2026
This RFP seeks proposals from qualified firms for a Water Tank Asset Maintenance Program, including engineering, professional management, cellular site management, inspection, rehabilitation, repairs, washouts, water stratification eliminations, safety devices, visual inspections, and coating of water storage tanks.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Use only if you can document inadequate competition; otherwise expect a competitive bid.
Coops: Buyer hasn’t historically used coops/resellers, but you can encourage them to explore these procurement programs and these resellers as future options.
Entity: City of Mebane, NC.
Status: Deprioritized; city lacks formal sole source contracts.
Board meetings and strategic plans from City of Mebane
This Comprehensive Plan for the City of Mebane, North Carolina, serves as a roadmap to guide future growth and enhance the quality of life until 2045. It is built upon ten community goals, including fostering a vibrant downtown, ensuring safe and bikeable streets, protecting natural areas, celebrating cultural history, providing plentiful recreation, cultivating an inclusive community, supporting flourishing businesses, maintaining sustainable infrastructure, offering diverse community services, and ensuring abundant and affordable housing choices. Key strategies prioritize infill and vertical growth, maximize existing infrastructure, establish mixed-use nodes, and protect community character and natural resources.
The key discussion topics for the meeting include the approval of the December 15, 2025, meeting minutes, an update on City Council actions, and subsequent agenda items focused on rezoning requests. Specifically, there is a request to rezone property at Giles Street and Vance Street from R-20 to R-8. Another substantial request involves rezoning five properties totaling approximately 26.44 acres near Gibson Road from R-20 to R-8(CD) to permit a development of 82 single-family homes, which also requires addressing inconsistencies with the Mebane 2045 Comprehensive Plan. Other items include an amendment to the Mebane 2045 Comprehensive Plan and updates to the 2026 Regular Meeting Calendar.
The meeting included discussion of city council action updates, including the comprehensive plan. A request to establish a general business conditional district zoning was presented, including the need for annexation before council action. The proposal includes a convenience store with gas pumps, requiring traffic impact analysis and roadway improvements. There were discussions regarding buffering, landscaping, and environmental technology used in the project. The board also discussed the number of diesel and car pumps.
The Planning Board meeting included discussions and updates on various topics. The board reviewed revisions to the Mebane 2045 Comprehensive Plan, including updates to the Future Land Use Map (FLUM) and considerations for different neighborhood types. There was a discussion about encouraging redevelopment of vacant properties and potential changes to the Suburban Neighborhood Place Type description. The board also discussed implementation projects, operational policies, and coordination with other local government units. The Mebane 2045 plan and the Planning Board's recommendations would be presented to the City Council on October 6, 2025.
The agenda includes items such as a request to establish B-2 (CD), General Business Conditional District, zoning for a convenience store with gas pumps, text amendments to the Mebane Unified Development Ordinance, and the proposed 2026 Regular Meeting Calendar.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Mebane's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge