Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Marengo
Project consists of the extension of public sanitary sewer and water main. Scope of work includes approx., 2.2 miles of 12" diameter water main, 1.2 mile of 8" diameter sanitary force main, lift station, along with other ancillary improvements, and road resurfacing. Open-cut and horizontal directional boring installations shall be allowed at certain locations and for certain improvements.
Posted Date
May 28, 2026
Due Date
Jun 30, 2026
Release: May 28, 2026
City of Marengo
Close: Jun 30, 2026
Project consists of the extension of public sanitary sewer and water main. Scope of work includes approx., 2.2 miles of 12" diameter water main, 1.2 mile of 8" diameter sanitary force main, lift station, along with other ancillary improvements, and road resurfacing. Open-cut and horizontal directional boring installations shall be allowed at certain locations and for certain improvements.
AvailableCity of Marengo
Work shall consist of hma resurfacing, bituminous surface removal, removal and replacement of pcc sidewalk and pcc curbing, hma patching, mh repairs, inlet repairs/replacement, pavement markings, and associated restoration and traffic control. Work includes pavement removal, full-depth 145 sy; bituminous surface removal, 2" 3831 sy; bituminous surface removal, var. Depth 15,711 sy; remove existing sign / sign support 2 ea; erosion control complete 1 ls; 2-ft wide pcc ribbon 75 lf; pcc barrier curb 43 lf; landscape restoration 1 ls; hma binder course, il-19. 0, n50 360 ton; hma surface course, il-9. 5, n50, mix c 3,037 ton; accessible parking signage / bollards 2 ea; pavement marking - line, 4" 1,302 lf; pavement marking - line, 8" 301 lf. See attached file.
Posted Date
Aug 5, 2025
Due Date
Aug 19, 2025
Release: Aug 5, 2025
City of Marengo
Close: Aug 19, 2025
Work shall consist of hma resurfacing, bituminous surface removal, removal and replacement of pcc sidewalk and pcc curbing, hma patching, mh repairs, inlet repairs/replacement, pavement markings, and associated restoration and traffic control. Work includes pavement removal, full-depth 145 sy; bituminous surface removal, 2" 3831 sy; bituminous surface removal, var. Depth 15,711 sy; remove existing sign / sign support 2 ea; erosion control complete 1 ls; 2-ft wide pcc ribbon 75 lf; pcc barrier curb 43 lf; landscape restoration 1 ls; hma binder course, il-19. 0, n50 360 ton; hma surface course, il-9. 5, n50, mix c 3,037 ton; accessible parking signage / bollards 2 ea; pavement marking - line, 4" 1,302 lf; pavement marking - line, 8" 301 lf. See attached file.
City of Marengo
The work shall consist of pavement removal, removal and replacement of PCC sidewalk and PCC curbing, HMA patching, and associated restoration and traffic control.
Posted Date
Aug 5, 2025
Due Date
Aug 19, 2025
Release: Aug 5, 2025
City of Marengo
Close: Aug 19, 2025
The work shall consist of pavement removal, removal and replacement of PCC sidewalk and PCC curbing, HMA patching, and associated restoration and traffic control.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Sole Source: If sale is less than $10,000, use sole source.
Coops: Lead with Sourcewell. Confirm your product is on a Sourcewell contract. For purchases under $10,000, work with the City Administrator. For larger buys, align with the department head and present to City Council as pre-competed to avoid formal bidding.
Entity: City of Marengo, IL.
Evidence: No clear sole source policy or thresholds found in public records; this path is deprioritized.
Board meetings and strategic plans from City of Marengo
The council discussed amending the number of BYOB permits issued, and also discussed amending offenses against public peace, safety and morals, of the Marengo Municipal Code regarding weapons, to comply with Illinois State Statute. The council also discussed authorization to execute change order with Williams Brothers Construction Inc for Wastewater Treatment Plant Expansion. The council reviewed the draft of the FY 2014/2015 Water & Sewer Fund Budget. There were also department head and staff reports.
The council discussed traffic and connector road designs for the proposed Pleasant Grove/Park Meadows Development and the Southridge Subdivision. They reviewed a presentation by Marengo Community Radio, including a request for financial assistance. An ordinance was approved establishing a BYOB permit class. Another ordinance was approved authorizing a fifteen-minute restricted parking area in the central business district. The council reviewed a concept plan for Pleasant Grove Estates/Park Meadows and discussed water/sewer connections and a bike path. An ordinance amending water and sewer rates was also approved. Updates were given on winter weather, WWTP construction, frozen water lines, the budget process, and a Tollway meeting. The council entered an executive session for personnel matters.
The council discussed concerns about the proposed new location for Dollar General, including flooding issues and traffic concerns. They considered a variance for East Grant Highway and Shady Lane for Dollar General, focusing on setback variations, lighting, and traffic accommodation. The council also reviewed proposals for FY 2013/14 auditing services and discussed the possibility of refinancing Series 2003 Bonds for water/sewer improvements, including replacing old water lines and adding a new well. Additionally, they authorized work change directives for the WWTP Expansion Project and a contract with HR Green for a Sewer Planning Study. The council reviewed and approved the draft FY 2014/15 Budget and discussed upcoming water system flushing. They also entered an executive session for personnel matters and real estate acquisition, and later executed a back pay agreement and release for a former employee.
The council discussed a funding request from Marengo Main Street, authorized a contract with HR Green for water main replacement engineering, and waived the formal bidding process for a police department radio upgrade project. They also authorized a proposal for an ash tree removal program and an intergovernmental agreement with Marengo and Riley Townships regarding Pace Dial-A-Ride. Reports were given by department heads and staff, including updates on the Wastewater department, the Marengo Police Pension Fund, the Prospect Street Project, and the wastewater treatment plant. The possibility of a continuous sidewalk on the North side of Route 20 was also discussed.
The Marengo City Council meeting on July 23, 2018, addressed concerns from residents about Coon Creek Road flooding, approved the minutes of the July 9, 2018, meeting, and approved the list of bills. A bid from Trine Construction Corporation for a water main replacement project was accepted, and an amendment to the Collective Bargaining Agreement with the Teamsters Local 700 was approved. A resolution was passed to not pursue additional access on Route 23 between Coon Creek Road and Harmony Road.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Marengo's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge