Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Haltom City
Work includes install approx 2,200 LF 8" PVC water line along with fire hydrants & gate valves. Also, remove ex ssmh, construct ssmh, install approx 200 LF 8" PVC san sewer pipe. All w/hmac & concrete pavement repair. Work also includes 1 LS general site preparation; 2 EA construction sign; 614 SY remove exist conc drive; 10 EA remove exist valve box and abandon gate valve in place; 10 EA 6" gate valve and box; 5 EA standard fire hydrant; 2.6 TN mechanical joint ductile iron fittings. See attached file.
Posted Date
-
Due Date
Jun 30, 2026
Release: -
City of Haltom City
Close: Jun 30, 2026
Work includes install approx 2,200 LF 8" PVC water line along with fire hydrants & gate valves. Also, remove ex ssmh, construct ssmh, install approx 200 LF 8" PVC san sewer pipe. All w/hmac & concrete pavement repair. Work also includes 1 LS general site preparation; 2 EA construction sign; 614 SY remove exist conc drive; 10 EA remove exist valve box and abandon gate valve in place; 10 EA 6" gate valve and box; 5 EA standard fire hydrant; 2.6 TN mechanical joint ductile iron fittings. See attached file.
AvailableCity of Haltom City
The project consists of reconstructing approx. 904 LF of Street. This includes reconstructing the existing asphalt roadway to a concrete section consisting of 6" reinforced concrete with 8" flexible base. This project also includes the installation of approx. 5116 LF of 6" - 12" water line, 560 LF of reinforced concrete pipe of various sizes, and approximately 4404 LF of 8" sanitary sewer line. Additionally, this project includes ADA compliant sidewalks with curb ramps and driveways.
Posted Date
May 18, 2026
Due Date
Jun 9, 2026
Release: May 18, 2026
City of Haltom City
Close: Jun 9, 2026
The project consists of reconstructing approx. 904 LF of Street. This includes reconstructing the existing asphalt roadway to a concrete section consisting of 6" reinforced concrete with 8" flexible base. This project also includes the installation of approx. 5116 LF of 6" - 12" water line, 560 LF of reinforced concrete pipe of various sizes, and approximately 4404 LF of 8" sanitary sewer line. Additionally, this project includes ADA compliant sidewalks with curb ramps and driveways.
City of Haltom City
The project consists of reconstructing approx. 2,115 LF of Rita Lane from Vicki Street to Ira Street. This includes reconstructing the existing asphalt roadway to a concrete section consisting of 6” reinforced concrete with 8” flexible base. This project also includes the installation of approx. 2,880 LF of 6”–8” water line, 2,915 LF of reinforced concrete pipe of various sizes, and approx. 2,875 LF of 6”–12” sanitary sewer line. Additionally, this project includes construction of ADA compliant sidewalks with curb ramps and driveways.
Posted Date
Apr 28, 2026
Due Date
May 19, 2026
Release: Apr 28, 2026
City of Haltom City
Close: May 19, 2026
The project consists of reconstructing approx. 2,115 LF of Rita Lane from Vicki Street to Ira Street. This includes reconstructing the existing asphalt roadway to a concrete section consisting of 6” reinforced concrete with 8” flexible base. This project also includes the installation of approx. 2,880 LF of 6”–8” water line, 2,915 LF of reinforced concrete pipe of various sizes, and approx. 2,875 LF of 6”–12” sanitary sewer line. Additionally, this project includes construction of ADA compliant sidewalks with curb ramps and driveways.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Rarely used; pivot to coops to avoid delays.
Coops: Use an eligible cooperative contract (e.g., Texas DIR or BuyBoard) to purchase directly.
Given the near non-existence of sole source awards, deprioritize this path and pivot immediately to cooperative purchasing to avoid delays and friction.
Board meetings and strategic plans from City of Haltom City
The Board approved three zoning applications. These included a variance and a special exception for a front yard carport and side yard setback encroachment at 5725 Brent Drive, as well as a variance for a reduction in side yard setback requirements at 3913 Ivey Street.
The meeting included a review of the current budget balance. Discussions were held regarding upcoming city events such as the Fire Open House, Carfest, Christmas on Broadway, and Cookies with Santa. The board coordinated responsibilities for the upcoming Fire/Police Camp, including logistics for check-in and meals. Plans were initiated for a BBQ fundraiser at the Senior Center, involving ticket sales and cost estimation. Furthermore, the board received updates on the selection of a clown trailer and discussed future collaboration opportunities between the Fire Services Board and the HCFD Association regarding community service projects.
The board reviewed and approved two variance applications for lot width reductions. The first application pertained to properties on Maxine Street for the construction of single-family residential homes, and the second concerned a site on Joplin Avenue for a new single-family residence. Both applications were approved following public hearings and board discussion.
The board reviewed and approved two variance applications for additional signage. The first application requested a variance for ground or monument signs at 4000 NE Loop 820, supported by the applicant for improved visibility. The second application requested a variance for attached signs at 4909 NE Loop 820, which was described as a standard signage package for the construction type. Both applications were approved following public hearings and board discussion.
The board discussed city updates regarding library donation programs and library responsibilities. The director's report covered outreach efforts, the library's official status as a Safe Place, the replacement of public computers, the installation of a new printing system, furniture procurement for the teen area, and the launch of a new eBook platform. Additionally, the board approved an addition to library policies concerning board and officer responsibilities, reviewed the status of the long-range plan, and received a report from the Friends of the Haltom City Public Library regarding recent activities, upcoming library giving days, and plans for new Little Libraries.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Haltom City's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge