Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Fosston's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
City Administrator
Director of Public Works
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Fosston
This RFP provides incentives for non-residential customers to install energy-efficient compressed air equipment, including no-loss condensate drains, low pressure drop filters, cycling refrigerated dryers, compressed air storage, and VSD air compressors.
Posted Date
Jan 1, 2026
Due Date
Mar 1, 2027
Release: Jan 1, 2026
City of Fosston
Close: Mar 1, 2027
This RFP provides incentives for non-residential customers to install energy-efficient compressed air equipment, including no-loss condensate drains, low pressure drop filters, cycling refrigerated dryers, compressed air storage, and VSD air compressors.
AvailableCity of Fosston
construction of a new access road, site grading, culvert installation, and construction and installation of a new automated weather observation system (AWOS).
Posted Date
Mar 10, 2025
Due Date
Apr 2, 2025
Release: Mar 10, 2025
City of Fosston
Close: Apr 2, 2025
construction of a new access road, site grading, culvert installation, and construction and installation of a new automated weather observation system (AWOS).
City of Fosston
Traffic control; temporary water service; SWPPP implementation and maintenance; 7,796 SY, bituminous pavement removal; 3,559 LF, remove curb and gutter; 926 SY, remove sidewalk; 290 SY, remove driveway; 55 SY, remove valley gutter; clearing, grubbing, and tree removal; 400 CY, topsoil borrow; 2,784 SY, hydroseeding; 1,498 LF, 8" PVC sanitary sewer; 775 LF, 4" PVC sanitary service; 25 ea, sanitary sewer service connection; 6 ea, connection to existing sanitary sewer; 88 LF, 48" sanitary sewer manhole; 378 LF, 1" HDPE water service; 1,877 LF, 6" c-900 PVC watermain; 11 ea, 6" gate valve; 7 ea, connect to existing water main; 19 ea, curb stops & connect to existing service; 4 ea, install fire hydrant; 92 LF, 12" storm sewer pipe; 8 LF, 48" strom manhole; 18 LF, storm catch basin (30"); 8,869 SY, geotextile fabric; 3,559 LF, curb & gutter - standard; 47 SY, concrete valley gutter; 346 SY, concrete driveway; 878 SY, concrete sidewalk; 100 SF, truncated domes; 2,740 CY, aggregate base (Compacted in place); 6,854 SY, 4" bituminous pavement.
Posted Date
Jan 20, 2025
Due Date
Feb 6, 2025
Release: Jan 20, 2025
City of Fosston
Close: Feb 6, 2025
Traffic control; temporary water service; SWPPP implementation and maintenance; 7,796 SY, bituminous pavement removal; 3,559 LF, remove curb and gutter; 926 SY, remove sidewalk; 290 SY, remove driveway; 55 SY, remove valley gutter; clearing, grubbing, and tree removal; 400 CY, topsoil borrow; 2,784 SY, hydroseeding; 1,498 LF, 8" PVC sanitary sewer; 775 LF, 4" PVC sanitary service; 25 ea, sanitary sewer service connection; 6 ea, connection to existing sanitary sewer; 88 LF, 48" sanitary sewer manhole; 378 LF, 1" HDPE water service; 1,877 LF, 6" c-900 PVC watermain; 11 ea, 6" gate valve; 7 ea, connect to existing water main; 19 ea, curb stops & connect to existing service; 4 ea, install fire hydrant; 92 LF, 12" storm sewer pipe; 8 LF, 48" strom manhole; 18 LF, storm catch basin (30"); 8,869 SY, geotextile fabric; 3,559 LF, curb & gutter - standard; 47 SY, concrete valley gutter; 346 SY, concrete driveway; 878 SY, concrete sidewalk; 100 SF, truncated domes; 2,740 CY, aggregate base (Compacted in place); 6,854 SY, 4" bituminous pavement.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.