Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Emmett
Project includes the following Work: Replace existing water pipe and sewer pipe, replace the existing sidewalk, install or modify stormwater infrastructure, and replace the existing roadway to around the Wardwell Ave/Mckinley Avenue and 7th Street loop.
Posted Date
Mar 11, 2026
Due Date
Apr 8, 2026
Release: Mar 11, 2026
City of Emmett
Close: Apr 8, 2026
Project includes the following Work: Replace existing water pipe and sewer pipe, replace the existing sidewalk, install or modify stormwater infrastructure, and replace the existing roadway to around the Wardwell Ave/Mckinley Avenue and 7th Street loop.
AvailableCity of Emmett
Goods shall include: Premanufactured lift station, including submersible pump, piping, valves, electrical and control wiring and instrumentation required for a complete and operable system. Standby power generator and automatic transfer switch (separate from the package lift station skid).
Posted Date
Jan 29, 2025
Due Date
Feb 25, 2025
Release: Jan 29, 2025
City of Emmett
Close: Feb 25, 2025
Goods shall include: Premanufactured lift station, including submersible pump, piping, valves, electrical and control wiring and instrumentation required for a complete and operable system. Standby power generator and automatic transfer switch (separate from the package lift station skid).
City of Emmett
Project includes the following Work: Bid Schedule 1: The construction of a new above ground, bolted-steel, 300,000 gallon water storage tank, site piping, altitude valve assembly, underground electrical and fiber optics, limited instrumentation and controls, gravel access roads, site fencing, an overflow and stormwater retention pond, and other miscellaneous site improvements. Bid Schedule 2: The construction of pressure reducing valve station, piping, surface repairs, and appurtenances on E 12th Street.
Posted Date
Dec 26, 2024
Due Date
Jan 31, 2025
Release: Dec 26, 2024
City of Emmett
Close: Jan 31, 2025
Project includes the following Work: Bid Schedule 1: The construction of a new above ground, bolted-steel, 300,000 gallon water storage tank, site piping, altitude valve assembly, underground electrical and fiber optics, limited instrumentation and controls, gravel access roads, site fencing, an overflow and stormwater retention pond, and other miscellaneous site improvements. Bid Schedule 2: The construction of pressure reducing valve station, piping, surface repairs, and appurtenances on E 12th Street.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not advisable here—pivot to a coop or prep for a competitive bid emphasizing Idaho jobs/local economic impact.
Coops: Lead with BuyBoard if your product is on contract; this is the fastest compliant path.
City of Emmett (ID): No evidence that sole source is used. Deprioritize this path. Redirect efforts to cooperative purchasing or prepare for a formal competitive bid.
Board meetings and strategic plans from City of Emmett
The City Council meeting addressed several key business items. Decisions were made regarding the acquisition of the Emmett Fire Department Type 3 Engine, utilizing various funding sources including capital improvement, reimbursement, and general funds. The Council approved an Agreement for Professional Services with Keller Associates, Inc. for the Transportation Master Plan Update, and awarded a quote to Goble Sampson Associates for the wastewater treatment plant clarifier rebuild. Furthermore, the process to acquire the Idaho Fish and Game Surplus Property (Emmett Airport Pond) was initiated. A Dog Impound & Sheltering Agreement was tabled until the second meeting in February. Discussion and a motion to table occurred regarding the Preliminary Plat for Proposed Treasure Hills Subdivision (PP 25-004) due to concerns over roadway conditions, lack of secondary access, pedestrian safety, and lighting, with the decision deferred to allow for City Code citation clarification. Department activity reports were received from various departments including Building Official/City Planner, Treasurer, Fire Department, Library, Public Works, Systems Administrator, and City Clerk. The meeting concluded after public comment and adjournment.
The City of Emmett Council meeting included the Proclamation of the Emmett Public Library Centennial Year, followed by an annual update from the CEO of Valor Health. The consent agenda, which was approved, included the minutes from the December 16, 2025 Regular Meeting and approval of accounts payables. Key non-consent agenda items included the installation of re-elected Councilors Harris, Resinkin, and Nebeker, and the subsequent election of Councilor Butler as Council President by acclamation. The council approved the appointment of Lynsie Vickery as Assistant (Deputy) Fire Chief and adopted Resolution #R2026-01 concerning a rounding adjustment for solid waste rates, and Resolution #R2026-02 adopting the City's Purchasing Policy. Further actions included approving a purchase from Axon Enterprise, Inc., approving Pay Request No 6 for the Upper Pressure Zone 1 Storage Tank project, and granting a one-year time extension for Rocky Mountain Companies to file a Final Plat for Long Horn Acres Subdivision, Phase 2. Department activity reports were received, and following an executive session to discuss imminent litigation, the council directed outside counsel to proceed with the direction given.
The regular council meeting included standard proceedings such as the Pledge of Allegiance and a community invocation. Key business items involved the payment for the Emmett Fire Department Type 3 Engine, approval of an Agreement for Professional Services with Keller Associates, Inc. for the Transportation Master Plan Update, consideration of a quote for the wastewater treatment plant clarifier rebuild, and the acquisition of Idaho Fish and Game surplus property at the Emmett Airport. The council also addressed the Dog Impound & Sheltering Agreement with Pet Adoption League of Gem County and a Preliminary Plat for the Proposed Treasure Hills Subdivision. Various department heads provided activity reports.
The City Council meeting addressed numerous items across its departments. Key actions included approving the Consent Agenda, which covered previous minutes and accounts payable. Under the Non-Consent Agenda, the Council approved the Citizen Portal Services Agreement and Merchant Agreement with Nuvei. Resolution #R2025-10 was approved, authorizing an adjustment for Building Permit and Plan Review Rates to the nearest nickel. The Council also approved the purchase of a 2021 Crafco Supershot 250D Chip Sealer. Furthermore, Resolution #R2025-11 was approved, supporting a project identification submittal for the 12th St and Substation Intersection construction to LHTAC, and the corresponding ITD Right of Way Activities Certificate of Completion was approved. Departmental activity reports were received from Building Official/City Planner, Treasurer, Fire Department, Library, Police Department, Public Works, Systems Administrator, and City Clerk. The meeting concluded with an Executive Session to consider the evaluation, dismissal, or disciplining of a public officer, employee, staff member, or agent.
This document evaluates the existing transportation network within the City of Emmett, identifies needs, and presents a plan to address those needs. It covers existing conditions including roadways, structures, intermodal transport, access management, traffic volumes, and safety. The plan details asset management strategies for pavements and signs, outlines a future transportation system vision including truck routes, a bypass corridor, and new roads, and provides site-specific analyses and capital improvement projects. It establishes a long-range Capital Improvement Plan and is intended as a living document to continually identify and prioritize transportation deficiencies.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Emmett's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database