Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Arco
Schedule a: runway 6-24 full depth reclamation. Schedule b: install airfield lighting. Schedule c:install edge drains schedule d:install navaids. Runway 6-24 full depth reclamation includes abandoning approx.,1810' of existing runway and associated parallel taxiway, in-place full depth reclamation of the existing asphalt and base with cement on the remaining runway and taxiway connectors, removing two existing taxiway connectors, constructing one new taxiway connector, shouldering, topsoiling and seeding, pavement markings, and other items. Approximate civil quantities include 47,750 SY of in-place pavement section recycling, 820 tons of cement, 9,800 tons of hot mix asphalt pavement, 30,300 SF of pavement marking. Install airfield lighting consists of removing existing runway edge and end lighting, installing new edge and threshold lights, replacing regulators, pilot-controlled lighting system, and other miscellaneous electrical equipment in the existing vault building and relocating/adjusting existing guidance signs. Approx., quantities include 500 LF of conduit patching, 11,730 of counterpoise, 12,130 LF of 5KV conductor and 110 new MIRL fixtures. Install edge drains consists of installing new pavement underdrains along runway 6-24 and taxiway connectors. Work includes installing edge drain and outlet pipe. Approx. , quantities include 12,190 LF of underdrain pipe and 1,530 LF of outlet pipe. Install navaids consists of furnishing and installing two sets of runway en identifier lights (reil), furnishing and installing two precision approach path indicator (PAPI) systems and replacing an existing rotating beacon. Work included furnishing and installing all equipment, materials, and services necessary to place equipment in operation and ready for commissioning by the FAA.
Posted Date
Jun 5, 2025
Due Date
Jun 25, 2025
Release: Jun 5, 2025
City of Arco
Close: Jun 25, 2025
Schedule a: runway 6-24 full depth reclamation. Schedule b: install airfield lighting. Schedule c:install edge drains schedule d:install navaids. Runway 6-24 full depth reclamation includes abandoning approx.,1810' of existing runway and associated parallel taxiway, in-place full depth reclamation of the existing asphalt and base with cement on the remaining runway and taxiway connectors, removing two existing taxiway connectors, constructing one new taxiway connector, shouldering, topsoiling and seeding, pavement markings, and other items. Approximate civil quantities include 47,750 SY of in-place pavement section recycling, 820 tons of cement, 9,800 tons of hot mix asphalt pavement, 30,300 SF of pavement marking. Install airfield lighting consists of removing existing runway edge and end lighting, installing new edge and threshold lights, replacing regulators, pilot-controlled lighting system, and other miscellaneous electrical equipment in the existing vault building and relocating/adjusting existing guidance signs. Approx., quantities include 500 LF of conduit patching, 11,730 of counterpoise, 12,130 LF of 5KV conductor and 110 new MIRL fixtures. Install edge drains consists of installing new pavement underdrains along runway 6-24 and taxiway connectors. Work includes installing edge drain and outlet pipe. Approx. , quantities include 12,190 LF of underdrain pipe and 1,530 LF of outlet pipe. Install navaids consists of furnishing and installing two sets of runway en identifier lights (reil), furnishing and installing two precision approach path indicator (PAPI) systems and replacing an existing rotating beacon. Work included furnishing and installing all equipment, materials, and services necessary to place equipment in operation and ready for commissioning by the FAA.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from City of Arco
The Council meeting included the swearing in of a new Assistant Deputy Clerk and a special recognition ceremony for a volunteer at the Arco Hawkbill Sail and Science Center. Key discussion topics included the proposed agreement between the Big Lost River Irrigation District and the City regarding the replacement of the Hazel Street Culvert, the approval of bills for payment, and updates on the Park Grant Project for new restroom facilities, EV station infrastructure, and Greenbelt pathway improvements. Additionally, the Council discussed coordination with Butte County Planning & Zoning on the Area of Impact agreement, plans for revising city ordinances, and potential updates to the city's EV charging station and website photo content.
The council discussed financial tracking system issues related to ARPA and DEQ grant funds, the resolution and attendee delegation for Water District #34, and authorization for the maintenance supervisor to purchase a used city vehicle. Additionally, the council approved an alcohol license for a local business and reviewed proposals for snow removal services. Finally, the council reviewed and approved the payment of outstanding city bills.
The council discussed the draft map for the joint planning area and the upcoming public hearing process for the city and county comprehensive plans. A presentation regarding the advantages of adopting local flood ordinances for floodplain management was reviewed, with the council requesting time to examine examples before proceeding. Budgetary concerns were raised by a resident regarding the quarterly report and audit, and a proposal for summer car show and chili cook-off events was presented for future consideration as private ventures. Additionally, the council determined that further clarification on sewer fund spending and engineering study data is required before approving any increases to sewer fees. The council also approved payment of outstanding bills.
The council discussed and approved an increase to the Mayor's spending limit for maintenance equipment, raising it from $2,500.00 to $5,000.00 to facilitate more efficient purchasing processes.
The council discussed and accepted a bid for city hay cutting. A review of commercial garbage rate changes and collection schedule adjustments was presented, leading to the scheduling of a future public hearing. The council confirmed the appointment of members to the newly re-established City Planning and Zoning Commission. A special business license for a food truck was approved subject to inspection requirements. Additionally, the council reviewed and approved payments, discussed sign ordinances in relation to permit requests, received updates on summer seasonal staffing and road grant consulting, and addressed various community concerns regarding cemetery maintenance, tree planting for the Greenbelt, and public safety.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Arco's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge