Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Arco
Schedule a: runway 6-24 full depth reclamation. Schedule b: install airfield lighting. Schedule c:install edge drains schedule d:install navaids. Runway 6-24 full depth reclamation includes abandoning approx.,1810' of existing runway and associated parallel taxiway, in-place full depth reclamation of the existing asphalt and base with cement on the remaining runway and taxiway connectors, removing two existing taxiway connectors, constructing one new taxiway connector, shouldering, topsoiling and seeding, pavement markings, and other items. Approximate civil quantities include 47,750 SY of in-place pavement section recycling, 820 tons of cement, 9,800 tons of hot mix asphalt pavement, 30,300 SF of pavement marking. Install airfield lighting consists of removing existing runway edge and end lighting, installing new edge and threshold lights, replacing regulators, pilot-controlled lighting system, and other miscellaneous electrical equipment in the existing vault building and relocating/adjusting existing guidance signs. Approx., quantities include 500 LF of conduit patching, 11,730 of counterpoise, 12,130 LF of 5KV conductor and 110 new MIRL fixtures. Install edge drains consists of installing new pavement underdrains along runway 6-24 and taxiway connectors. Work includes installing edge drain and outlet pipe. Approx. , quantities include 12,190 LF of underdrain pipe and 1,530 LF of outlet pipe. Install navaids consists of furnishing and installing two sets of runway en identifier lights (reil), furnishing and installing two precision approach path indicator (PAPI) systems and replacing an existing rotating beacon. Work included furnishing and installing all equipment, materials, and services necessary to place equipment in operation and ready for commissioning by the FAA.
Posted Date
Jun 5, 2025
Due Date
Jun 25, 2025
Release: Jun 5, 2025
City of Arco
Close: Jun 25, 2025
Schedule a: runway 6-24 full depth reclamation. Schedule b: install airfield lighting. Schedule c:install edge drains schedule d:install navaids. Runway 6-24 full depth reclamation includes abandoning approx.,1810' of existing runway and associated parallel taxiway, in-place full depth reclamation of the existing asphalt and base with cement on the remaining runway and taxiway connectors, removing two existing taxiway connectors, constructing one new taxiway connector, shouldering, topsoiling and seeding, pavement markings, and other items. Approximate civil quantities include 47,750 SY of in-place pavement section recycling, 820 tons of cement, 9,800 tons of hot mix asphalt pavement, 30,300 SF of pavement marking. Install airfield lighting consists of removing existing runway edge and end lighting, installing new edge and threshold lights, replacing regulators, pilot-controlled lighting system, and other miscellaneous electrical equipment in the existing vault building and relocating/adjusting existing guidance signs. Approx., quantities include 500 LF of conduit patching, 11,730 of counterpoise, 12,130 LF of 5KV conductor and 110 new MIRL fixtures. Install edge drains consists of installing new pavement underdrains along runway 6-24 and taxiway connectors. Work includes installing edge drain and outlet pipe. Approx. , quantities include 12,190 LF of underdrain pipe and 1,530 LF of outlet pipe. Install navaids consists of furnishing and installing two sets of runway en identifier lights (reil), furnishing and installing two precision approach path indicator (PAPI) systems and replacing an existing rotating beacon. Work included furnishing and installing all equipment, materials, and services necessary to place equipment in operation and ready for commissioning by the FAA.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from City of Arco
The agenda for the meeting includes constant items such as the reading and approval of minutes from previous meetings and the approval of bills. Old Business consists of the first reading for Ordinances 2026-A (Water Department) and 2026-B (Water & Sewer Rates Billing). New Business items include a discussion regarding the America 250 Celebration and Health Kick for Kids, the presentation of the annual Audit, a Resolution concerning Fire Department Billing Services and Service Agreement, and a discussion on the Water Mitigation Plan.
The agenda for this City Council meeting includes constant items such as approving minutes from previous meetings and approving bills. Old Business items focus on the Water Mitigation Plan/Notice of Intent and multiple ordinance readings concerning the Water Department, Water & Sewer Rates Billing, and Mobile Homes and Recreational Vehicles. New Business topics involve discussions regarding parking at Pickles, a utility bill/sewer line repair with Lost River Construction, signing a Letter of Support for an America 250 Grant Application, and street maintenance/dust control options requested by Tony Chisham.
The City Council meeting agenda includes several constant items such as reading and approving minutes from previous meetings and approving bills. Old Business involves the second reading of Ordinance 2025-E 5.04 concerning Business Licenses. New Business items cover swearing in a new City Council Member, discussions and actions related to the TAP application with Camille Miller/Forsgren and ITD, a Pretty City Committee Update from Shelly Blackner, and a review of the estimate for a new roof on the City Shop from Tim Snyder.
The meeting included an update on the airport project, specifically a grant request for a fuel card reader system, and a discussion on the city's contribution to matching funds. Options for an online utility payment system were presented and approved. The Lost River Senior Center's annual support campaign was discussed, highlighting the need for financial support and volunteer drivers. The Idaho (Nuclear) Cleanup Project Citizens Advisory Board's recruitment of new members was mentioned. There were also discussions regarding property cleanup efforts, completion of the restroom facility at the Science Center/EV Park, cancellation of the December 23 meeting, lot cleanup improvements, a possible City staff holiday party, and updates from the Lost River Electric Coop annual meeting. The City Planning and Zoning Commission agenda and preparations for the Impact Area Public Hearing were also addressed.
The ordinance appropriates funds for the fiscal year beginning October 1, 2022, to cover the expenses and liabilities of the City of Arco. It specifies the objects and purposes for which the appropriation is made, including general fund expenses such as fire department, animal control, airport maintenance, parks, rec hall, legislative, administrative, and law enforcement. It also covers street expenses, garbage expenses, water expenses, and sewer expenses. Revenue and expenditure estimates are provided for various funds, including general, streets, garbage, water, and sewer.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Arco's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database