Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Dilworth
Installation of a proposed water main extension along an existing rural, aggregate road.
Posted Date
Feb 11, 2026
Due Date
Mar 9, 2026
Release: Feb 11, 2026
City of Dilworth
Close: Mar 9, 2026
Installation of a proposed water main extension along an existing rural, aggregate road.
AvailableCity of Dilworth
Bid Packages: 3A: Concrete - Building; 3B: Concrete Polishing; 3D: Precast Concrete Hollow Core Plank (Material); 4: Masonry; 5A: Structural Steel (Material); 5B: Structural Steel and Hollow Core (Erection); 6A: General Work and Labor ); 6B: Millwork (Material); 7A: Moisture Protection; 7B: Liquid Applied Weather Barriers; 7E: Prefinished Metal Panels; 7G: Sealants; 8A: Doors, Hardware, Frames; 8C: Overhead Doors and Coiling Doors; 8E: Glazing Systems; 9B: Drywall; 9C: Tilework; 9E: Acoustical; 9G: Resilient Flooring & Carpeting; 9I: Painting; 9J: Concrete Floor Finishes; 11E: Kitchen Equipment; 12B: Moveable Wall; 21: Building Sprinkler System; 22: Plumbing; 23: HVAC and Temp Controls; 26: Electrical Systems; 31: Earthwork; 32A: Paving and Surfacing; 33: Site Utilities;
Posted Date
Feb 5, 2026
Due Date
Feb 26, 2026
Release: Feb 5, 2026
City of Dilworth
Close: Feb 26, 2026
Bid Packages: 3A: Concrete - Building; 3B: Concrete Polishing; 3D: Precast Concrete Hollow Core Plank (Material); 4: Masonry; 5A: Structural Steel (Material); 5B: Structural Steel and Hollow Core (Erection); 6A: General Work and Labor ); 6B: Millwork (Material); 7A: Moisture Protection; 7B: Liquid Applied Weather Barriers; 7E: Prefinished Metal Panels; 7G: Sealants; 8A: Doors, Hardware, Frames; 8C: Overhead Doors and Coiling Doors; 8E: Glazing Systems; 9B: Drywall; 9C: Tilework; 9E: Acoustical; 9G: Resilient Flooring & Carpeting; 9I: Painting; 9J: Concrete Floor Finishes; 11E: Kitchen Equipment; 12B: Moveable Wall; 21: Building Sprinkler System; 22: Plumbing; 23: HVAC and Temp Controls; 26: Electrical Systems; 31: Earthwork; 32A: Paving and Surfacing; 33: Site Utilities;
City of Dilworth
The Project includes the following Work: Dewatering, sediment excavation, hauling and stockpiling, and site restoration.
Posted Date
Dec 22, 2025
Due Date
Jan 12, 2026
Release: Dec 22, 2025
City of Dilworth
Close: Jan 12, 2026
The Project includes the following Work: Dewatering, sediment excavation, hauling and stockpiling, and site restoration.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not a practical path here—pivot straight to coops.
Coops: Start here. Use Sourcewell, BuyBoard, or Lakes Country Service Cooperative to buy now. Confirm your product is on-contract and coordinate with City Hall and the department head to proceed.
City of Dilworth: No evidence of a sole source pathway in use. Deprioritize and immediately pivot to cooperative contracts.
Board meetings and strategic plans from City of Dilworth
The key discussions and actions taken during the meeting included reviewing and filing building permits for December 2025, and taking action on several zoning and platting matters. The commission considered zoning changes for properties slated for annexation, including proposing I1 Industrial zoning for Parcel IDs 23.046.0010 and 23.046.0020, which are associated with RESCO and RRVCP developments. Furthermore, the commission reviewed the preliminary and final plat for the Community Center Addition (Parcel ID 52.900.0001) and considered its recommended zoning of MU-2 Rail Mixed-Use, which aligns with the Future Land Use Map designation of "Public & Institutional." The commission also discussed the zoning request for Parcel ID 52.325.0010 (Block 4, Houges 6th Addition) to R3 Residential to allow for three twin home units, necessitating a concurrent review of a Planned Unit Development. Finally, the need to establish a subcommittee to assist staff in reviewing updates to the Dilworth Zoning Ordinance was addressed.
The City Council meeting addressed several agenda items including the approval of the 2026 Fee Schedule via Ordinance 26-01, and the authorization of a Limited Use Permit renewal with the Minnesota Department of Transportation for an entrance sign. Key actions included authorizing the hire of a Warming House Attendant, approving training requests for council members for an Intergovernmental Retreat and a BIA New Years Celebration, and approving the hiring of a Police Officer. Furthermore, the Council considered and passed resolutions for the orderly annexation of approximately 383 acres in conjunction with the Cities of Moorhead and Moorhead Township, and Oakport Township. Other items involved recognizing the 2025 Star Businesses of the Year (U-Haul and TAK Event Center) and resolutions for accepting land and monetary donations for the New Dilworth Community Center and Community Outreach, respectively. The Council also approved pay request number one and several change orders related to the 34th Street Reconstruction Project, and awarded the bid for the Woodbridge and Summerwood Ponds Dredging Project.
The Planning Commission meeting included the approval of the minutes from the December 3, 2025 meeting (which involved public hearings on the 2025 Comprehensive Plan and an outdoor storage zoning amendment). Key considerations for this meeting included the selection of 2026 Planning Commission Officers, forwarding a recommendation to the City Council to adopt the draft 2025 Comprehensive Plan ('Imagine Dilworth') and authorizing Metro COG to adjust the future land use map for further review. The commission also considered the annexation of 382.26 acres from Oakport and Moorhead Townships for future development, which involved initiating the necessary resolution for the City Council, and recommending the I-1 Industrial zoning designation for the annexed RESCO and RRVCP properties. Finally, the meeting included receiving and filing building permits for November 2025 and a project update on the community center design phase.
The meeting agenda included approval of prior meeting minutes, a public hearing regarding Ordinance 24-11 which amends zoning regulations pertaining to Commercial Outdoor Seating and Event Area Regulations, and receiving and filing building permits for September 2024. The public hearing focused on new draft regulations for outdoor seating, including requirements for screening, lighting, and access, as well as stipulations for smoking patios adjacent to residential districts. The Commission also considered a recommendation for the City Council to approve 2024 Border City Tax Credits for several businesses.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Dilworth's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Dilworth's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database