Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Breaux Bridge
The work consists of the installation of approx 5,920 LF of 6" PVC water main; 10 hydrants and related piping and valves, related items of water main work, and all related pavement, utility, and drainage work.
Posted Date
Jun 11, 2025
Due Date
Jul 9, 2025
Release: Jun 11, 2025
City of Breaux Bridge
Close: Jul 9, 2025
The work consists of the installation of approx 5,920 LF of 6" PVC water main; 10 hydrants and related piping and valves, related items of water main work, and all related pavement, utility, and drainage work.
City of Breaux Bridge
Work for this project is generally described as the selective interior and exterior demolition of damaged interior finishes and roofing materials and decking, replacement of roof decking, underlayment, roofing shingles, vent caps, fascia, sub-fascia, metal trim and flashings, interior gypsum finishes, painting, and other interior and exterior work.
Posted Date
Jul 25, 2024
Due Date
Aug 13, 2024
Release: Jul 25, 2024
City of Breaux Bridge
Close: Aug 13, 2024
Work for this project is generally described as the selective interior and exterior demolition of damaged interior finishes and roofing materials and decking, replacement of roof decking, underlayment, roofing shingles, vent caps, fascia, sub-fascia, metal trim and flashings, interior gypsum finishes, painting, and other interior and exterior work.
City of Breaux Bridge
The work consists of construction of a new backwash/transfer pump station, installation of a new backwash/transfer pump, relocation of an existing backwash pump, demolition of of the existing reinforced concrete clearwell cover and installation of a new geodetic dome cover, site piping, electrical and controls necessary to complete work.
Posted Date
Nov 9, 2024
Due Date
Dec 6, 2024
Release: Nov 9, 2024
City of Breaux Bridge
Close: Dec 6, 2024
The work consists of construction of a new backwash/transfer pump station, installation of a new backwash/transfer pump, relocation of an existing backwash pump, demolition of of the existing reinforced concrete clearwell cover and installation of a new geodetic dome cover, site piping, electrical and controls necessary to complete work.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; pivot immediately to a cooperative contract.
Coops: Lead with Sourcewell. Confirm your product is on contract, ask procurement to confirm piggybacking, and position it as the fastest, fully compliant path to avoid the >$25,000 formal bid and reduce local-preference friction.
City of Breaux Bridge rarely awards sole source and strongly prefers competitive processes. Sole source justifications are exceedingly difficult and an inefficient use of sales effort.
Track City of Breaux Bridge's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database