Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Babbitt
Procurement of a solids dewatering system including screw press, solids feed pump, polymer feed system, conveyor, and controls; and the equipment, materials, installation assistance, start-up assistance, and operator training specified. Installation of the electrical service needed will be completed by a contractor to be procured separately.
Posted Date
Feb 27, 2026
Due Date
Mar 19, 2026
Release: Feb 27, 2026
City of Babbitt
Close: Mar 19, 2026
Procurement of a solids dewatering system including screw press, solids feed pump, polymer feed system, conveyor, and controls; and the equipment, materials, installation assistance, start-up assistance, and operator training specified. Installation of the electrical service needed will be completed by a contractor to be procured separately.
AvailableCity of Babbitt
Work include approx: 19,790 cu yd granular borrow (CV); 19,530 CY excavation - common; 26,412 SF 4" concrete walk; 1,025 tn type sp 12.5 wearing course mix (2,b); 3,255 LF 8" PVC pipe sewer. 1 LS mobilization; 6 EA clearing; 6 EA grubbing; 3.55 acre clearing; 3.55 acre grubbing; 5 EA remove bollards; 1 EA remove utility vault; 1 EA remove septic tank; 2 EA salvage sign; 1 EA salvage frisbee golf net; 1 EA abandon & seal well shaft; 110 LF remove water service pipe; 32 LF sawing bituminous pavement (full depth); 470 SF remove concrete slab; 64 SF remove bituminous pavement; 19790 CY granular borrow (CV); 250 CY excavation - rock; 19530 CY excavation common (p); 1 LS dewatering; 278 SY geogrid type 2; 35.5 road STA subgrade preparation; 580 CY aggregate surfacing (CV) class 5 (p). See attached file.
Posted Date
Aug 28, 2025
Due Date
Sep 25, 2025
Release: Aug 28, 2025
City of Babbitt
Close: Sep 25, 2025
Work include approx: 19,790 cu yd granular borrow (CV); 19,530 CY excavation - common; 26,412 SF 4" concrete walk; 1,025 tn type sp 12.5 wearing course mix (2,b); 3,255 LF 8" PVC pipe sewer. 1 LS mobilization; 6 EA clearing; 6 EA grubbing; 3.55 acre clearing; 3.55 acre grubbing; 5 EA remove bollards; 1 EA remove utility vault; 1 EA remove septic tank; 2 EA salvage sign; 1 EA salvage frisbee golf net; 1 EA abandon & seal well shaft; 110 LF remove water service pipe; 32 LF sawing bituminous pavement (full depth); 470 SF remove concrete slab; 64 SF remove bituminous pavement; 19790 CY granular borrow (CV); 250 CY excavation - rock; 19530 CY excavation common (p); 1 LS dewatering; 278 SY geogrid type 2; 35.5 road STA subgrade preparation; 580 CY aggregate surfacing (CV) class 5 (p). See attached file.
City of Babbitt
Work consists of removing the existing refrigeration system, cooling towers, pumps, expansion tanks, wall sections, ventilation systems, etc. and providing a new ammonia refrigeration system. Work includes demolition, concrete, rough carpentry, piping, insulation, piping, refrigeration equipment, electrical, controls, door hardware, doors, gypsum board, ventilation systems, plumbing, and related items.
Posted Date
Apr 7, 2025
Due Date
Apr 29, 2025
Release: Apr 7, 2025
City of Babbitt
Close: Apr 29, 2025
Work consists of removing the existing refrigeration system, cooling towers, pumps, expansion tanks, wall sections, ventilation systems, etc. and providing a new ammonia refrigeration system. Work includes demolition, concrete, rough carpentry, piping, insulation, piping, refrigeration equipment, electrical, controls, door hardware, doors, gypsum board, ventilation systems, plumbing, and related items.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from City of Babbitt
The City of Babbitt has completed a comprehensive plan and housing survey to prepare for future growth and employment. Key initiatives include the renovation and utilization of the Babbitt Municipal Center for administrative and public services, active economic development efforts through grant programs and business attraction, and the sale of residential lots to support community expansion.
The special meeting was called to order for the purpose of conducting interviews for the campground host position. Discussion was held regarding the interview results and the needs for the position. The council subsequently moved to reopen the Campground Host position for new applications to be reviewed at the second meeting in February 2026, with administrative staff instructed to encourage former applicants to reapply.
The Recreation Advisory Board meeting included discussions regarding arena usage fees, cleaning fees for arena rentals, and the possibility of offering open roller skating sessions during the summer. The board also addressed concerns about the skate park's condition and the need for repairs, suggesting the exploration of composite coverings and contractor quotes.
The commission discussed the West Babbitt Development Design and concerns about the lift station, including maintenance costs and potential revenue. They also discussed the Deep Winter Greenhouse project's request for water delivery and set a price for the service. The commission approved the repair of the digester mixer and reviewed the overtime report. The operator's report included updates on the transition and potential options for a biosolid press system. Additionally, a pause was approved for the Land Application Suitability Study, and all bills and payrolls were approved.
The meeting addressed the request from a member of the public regarding tenants putting utilities in their name and the option to pay utility bills via credit card. The commission approved Magney Pay App No. 19. The PUC monthly meeting schedule was changed to the second Wednesday of each month. The overtime report was reviewed, and the Operators reported on the need for an additional dumpster at the WWTP, advising residents it is acceptable to stop running water for the winter season and that there were 0 freeze ups this winter. The possibility of accepting credit cards at City Hall for PUC bills was discussed, and Accounting Officer/Secretary Powell will discuss this with the City Clerk. All bills and payrolls were approved.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Babbitt's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Babbitt's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database