Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Auburn
Typical work includes general engineering, earthwork, landscaping, electrical, concrete, paving, plumbing and general building.
Posted Date
Apr 8, 2026
Due Date
Jun 15, 2026
Release: Apr 8, 2026
City of Auburn
Close: Jun 15, 2026
Typical work includes general engineering, earthwork, landscaping, electrical, concrete, paving, plumbing and general building.
AvailableCity of Auburn
Work consist of sitework, 50 TN of installation of rip rap, 56 CY of rock excavation, 3,200 SF of paving, sewer pump station construction, installation of electrical conduit and wiring, relocation and modification of existing control systems, panels and junction boxes, lighting, instrumentation and other work related to the installation, operation, and remote SCADA monitoring of the pump station facility, demolition and/or abandonment of existing building, paving, electrical controls, wet well, sewer, water, storm water piping, and valve vault, construction of a new hydropneumatic tank, tying into existing piping, and concrete equipment slab, landscaping / misc. Piping / painting and signage / equipment startup and testing.
Posted Date
Mar 30, 2026
Due Date
May 15, 2026
Release: Mar 30, 2026
City of Auburn
Close: May 15, 2026
Work consist of sitework, 50 TN of installation of rip rap, 56 CY of rock excavation, 3,200 SF of paving, sewer pump station construction, installation of electrical conduit and wiring, relocation and modification of existing control systems, panels and junction boxes, lighting, instrumentation and other work related to the installation, operation, and remote SCADA monitoring of the pump station facility, demolition and/or abandonment of existing building, paving, electrical controls, wet well, sewer, water, storm water piping, and valve vault, construction of a new hydropneumatic tank, tying into existing piping, and concrete equipment slab, landscaping / misc. Piping / painting and signage / equipment startup and testing.
City of Auburn
The City of Auburn (CA) is soliciting proposals for On-Call Land Surveying Services for a two-year agreement not to exceed $100,000. The scope includes reviewing maps and legal descriptions, field surveying, research and due diligence, and task-order assignments performed under a licensed professional land surveyor; invoices will be paid within 30 days. The opportunity opened 2026-03-16, questions are due 2026-04-06, and proposals close 2026-04-20 with a projected award on 2026-05-01.
Posted Date
Mar 16, 2026
Due Date
Apr 20, 2026
Release: Mar 16, 2026
City of Auburn
Close: Apr 20, 2026
The City of Auburn (CA) is soliciting proposals for On-Call Land Surveying Services for a two-year agreement not to exceed $100,000. The scope includes reviewing maps and legal descriptions, field surveying, research and due diligence, and task-order assignments performed under a licensed professional land surveyor; invoices will be paid within 30 days. The opportunity opened 2026-03-16, questions are due 2026-04-06, and proposals close 2026-04-20 with a projected award on 2026-05-01.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $40,000, use sole source.
Coops: Lead with Sourcewell to bypass formal bidding and mitigate the 5% local preference.
Entity: City of Auburn, CA.
Basis: Position the product as essential for interoperability with existing Placer County public safety systems or as a unique technology unavailable elsewhere.
Board meetings and strategic plans from City of Auburn
This document provides an FAQ for the City of Auburn's Active Transportation Plan and Comprehensive Safety Action Plan. The Active Transportation Plan outlines a vision for a network of trails, bike lanes, and sidewalks to enhance safe walking, bicycling, and rolling. The Comprehensive Safety Action Plan focuses on reducing and eliminating serious injury and fatal crashes for all roadway users. Both plans aim to improve safety, increase opportunities for active transport, connect communities, improve public health, reduce air pollution, and offer economic benefits.
The Auburn City Council held a special session focusing on economic recovery. Discussions included health and emergency response updates, the state of health within the community, and city actions and services. The council also addressed expanded outdoor dining, business personal protective equipment needs, and the potential for a 4th of July event, while emphasizing the importance of common-sense guidance and restrictions.
The meeting included discussions on the approval of the agenda, a roll call, and the consent calendar. Key topics included the 2021 street resurfacing project, environmental determination, and permission to advertise. Council members raised questions about the streets to be paved, project timelines, and coordination with Placer County. The council also discussed the Pavement Management Index (PMI) update and the process for handling streets that may no longer be eligible for resurfacing.
The workshop included updates on the health emergency response, city actions and services, and discussions on the Old Town Maple Street billboard. Updates were provided on Placer Shares program and additional grant programs. The Auburn Chamber of Commerce report included information on upcoming events, such as the city council candidates forum, a headshot fundraiser, and Halloween trick-or-treating plans. The decision to cancel the festival of lights was announced, but alternative plans for holiday lighting were discussed.
The council convened a special session and a motion was made to adjourn to a closed session.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Auburn's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge