Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Central West Virginia Regional Airport Authority
Work include fuel farm improvements.
Posted Date
Jun 2, 2026
Due Date
Jun 23, 2026
Release: Jun 2, 2026
Central West Virginia Regional Airport Authority
Close: Jun 23, 2026
Work include fuel farm improvements.
AvailableCentral West Virginia Regional Airport Authority
The owner plans to install an electric charging station for electric aircraft. BETA Technologies will be providing the charging cube, mini charging cube, power tower and panel board. All electrical items will be installed on concrete pads. Work includes Temporary construction items (including temporary AOA fence); Erosion and sediment control devices; Removal of existing pavement and general site clearing; Excavation and Topsoil Stockpiling; Installation of concrete pads; Installation of ductbanks and other electrical items (including connections to items provided by BETA). Restoration of the site. Anticipated Trades: Electrical, Concrete, Site Work, Fencing.
Posted Date
May 19, 2026
Due Date
Jun 15, 2026
Release: May 19, 2026
Central West Virginia Regional Airport Authority
Close: Jun 15, 2026
The owner plans to install an electric charging station for electric aircraft. BETA Technologies will be providing the charging cube, mini charging cube, power tower and panel board. All electrical items will be installed on concrete pads. Work includes Temporary construction items (including temporary AOA fence); Erosion and sediment control devices; Removal of existing pavement and general site clearing; Excavation and Topsoil Stockpiling; Installation of concrete pads; Installation of ductbanks and other electrical items (including connections to items provided by BETA). Restoration of the site. Anticipated Trades: Electrical, Concrete, Site Work, Fencing.
AvailableCentral West Virginia Regional Airport Authority
Install a new pre-engineered metal building (PEMB - approx. 23,560 SF) for the storage of snow removal equipment. SRE Building work includes: Removal of existing pavement and general site clearing. Erosion and sediment control device. Installation of a new Pre-Engineered Metal Building, including concrete footings. Installation of a paved roadway (asphalt) Installation of new utilities: Water, Sanitary, Electrical, Telecommunication and Storm drain. New fencing and gate. New Security Cameras and Card Readers. Installation of bollards, sidewalk and pavement marking.
Posted Date
Apr 28, 2026
Due Date
Jun 15, 2026
Release: Apr 28, 2026
Central West Virginia Regional Airport Authority
Close: Jun 15, 2026
Install a new pre-engineered metal building (PEMB - approx. 23,560 SF) for the storage of snow removal equipment. SRE Building work includes: Removal of existing pavement and general site clearing. Erosion and sediment control device. Installation of a new Pre-Engineered Metal Building, including concrete footings. Installation of a paved roadway (asphalt) Installation of new utilities: Water, Sanitary, Electrical, Telecommunication and Storm drain. New fencing and gate. New Security Cameras and Card Readers. Installation of bollards, sidewalk and pavement marking.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge