Assiscunk Creek Levee Section 3 Pipe #5 Replacement RFP
Posted
-
Dec 9, 2026
The City of Burlington is procuring all labor, materials, and equipment necessary to replace Pipe #5 in Section 3 of the Assiscunk Creek Levee, including replacement of the existing culvert pipe and installation of concrete headwalls. The work also includes installation of a driveway and a 10-foot wide sliding access gate and any related site restoration shown on the plans. Project documents and specifications were prepared by Pennoni Associates, Inc., and are available for review and distribution to prospective bidders.


