Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
School mascot.
Total number of staff members.
Highest grade level offered.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Briggs School District
The project consists of a 72'-6" x 40'-0" premanufactured tk modular classroom building each with accessible toilet rooms. The work includes excavation, grading, foundations, underground utilities and tie-ins to building(s), fire alarm system, communication, pa and data, signage, site flatwork, paving, striping, and a playground.
Posted Date
Jun 21, 2026
Due Date
Jul 24, 2026
Release: Jun 21, 2026
Briggs School District
Close: Jul 24, 2026
The project consists of a 72'-6" x 40'-0" premanufactured tk modular classroom building each with accessible toilet rooms. The work includes excavation, grading, foundations, underground utilities and tie-ins to building(s), fire alarm system, communication, pa and data, signage, site flatwork, paving, striping, and a playground.
AvailableBriggs School District
A Complete surface preparation and painting of ALL exterior surfaces for All buildings, 2-story building, portables, conex boxes, railing(steel and galvanized), poles, fence(s), block walls, marquee frame, existing art work minor repairs across the school, enclosures, doors, railings, signage, structural elements, fascia replacement, stencil removal & replacement, and curb painting and ne room ADA signage.
Posted Date
Mar 29, 2026
Due Date
Apr 24, 2026
Release: Mar 29, 2026
Briggs School District
Close: Apr 24, 2026
A Complete surface preparation and painting of ALL exterior surfaces for All buildings, 2-story building, portables, conex boxes, railing(steel and galvanized), poles, fence(s), block walls, marquee frame, existing art work minor repairs across the school, enclosures, doors, railings, signage, structural elements, fascia replacement, stencil removal & replacement, and curb painting and ne room ADA signage.
Briggs School District
A Complete surface preparation and painting of ALL exterior surfaces for All buildings, 2-story building, portables, conex boxes, railing(steel and galvanized), poles, fence(s), block walls, marquee frame, existing art work minor repairs across the school, enclosures, doors, railings, signage, structural elements, fascia replacement, stencil removal & replacement, and curb painting and ne room ADA signage.
Posted Date
Mar 29, 2026
Due Date
Apr 24, 2026
Release: Mar 29, 2026
Briggs School District
Close: Apr 24, 2026
A Complete surface preparation and painting of ALL exterior surfaces for All buildings, 2-story building, portables, conex boxes, railing(steel and galvanized), poles, fence(s), block walls, marquee frame, existing art work minor repairs across the school, enclosures, doors, railings, signage, structural elements, fascia replacement, stencil removal & replacement, and curb painting and ne room ADA signage.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Briggs School District
This Local Control and Accountability Plan (LCAP) for Briggs Elementary School District, covering the 2024-2027 cycle, outlines strategic goals focused on improving student outcomes. Key priorities include fostering a positive school climate and connectedness, increasing academic achievement in English Language Arts, Mathematics, and Science, and providing targeted support for English learners and long-term English learners to enhance language proficiency and reclassification rates. The plan also details the use of Equity Multiplier funds to support highly mobile student populations through professional learning communities, aiming to address identified performance disparities and ensure equitable services across all student groups.
The Board of Education discussed and acted upon several items including the Briggs School HVAC project, personnel authorizations, and various agreements with the Ventura County Office of Education for services such as financial systems, hosting, and speech and psychological support. Legal services agreements were approved, and the Board addressed the Briggs Teachers Association bargaining proposal, the renewal of the Superintendent's contract, and various policy and schedule revisions, including the classified holiday schedule and obsolete equipment. Additionally, the Board reviewed information on uniform complaints, enrollment, and held a public hearing for the Briggs Teachers' initial bargaining proposal.
The Board of Trustees conducted a regular meeting to address several operational and administrative items. Key discussions included personnel authorizations for various school staff, approval of service agreements with the Ventura County Office of Education for technology and psychological services, and a memorandum of understanding with the Mesa Union School District regarding special education services. The board also reviewed and ratified a service agreement with Apptegy for communication systems and approved the certification of signatures for the district. The Superintendent provided reports on district facilities, branding initiatives, and the implementation of new technology systems, while the board discussed future planning for student wellness centers.
The Board discussed a technology plan, conducted the Superintendent's evaluation, and reviewed personnel changes including employment changes for teachers and substitute teachers. Key action items included approving a request for allowance of attendance due to emergency conditions, approving various playground project quotes and contracts, awarding a bid for the Briggs School playground project, approving geotechnical engineering services, and purchasing Chromebooks. Additionally, the Board approved an MOU for various youth and mental health services, a document tracking services licensing agreement, a contract for hearing conservation services, the school calendar, and the disposal of obsolete equipment.
The board meeting focused on several key items including the dedication of the Deborah E. Cuevas Multi-Use Building, reports on student achievements in the migrant speech and debate program, and updates on state testing and end-of-year events. The board approved several financial and administrative items such as the 2024-2025 proposed budget, the Local Control Accountability Plan, and various service agreements for instructional services, professional repairs for the school kitchen, and fire alarm maintenance. Additionally, resolutions were passed regarding school bond elections, temporary loans, and compensation improvements for certain employee categories.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Briggs School District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge