Musconetcong River Road Water Main Replacement Project (RE-BID)
Apr 29, 2026
Closes
Sep 15, 2026
The work will include approx 2,100 LF of 8" Ductile Iron Pipe Cl 52 Water Main, Fittings, & Joints; 240 LF of 4" Ductile Iron Pipe Cl 52 Water Main, Fittings, & Joints; 1 LS of 8" HDPE Casing Pipe 4" HDPE Horizontal Directional bore; Excavation; 5 EA of Utility Pole Bracing System (If and Where Directed); 2 EA of 1" Water Service, Complete -Customer Side (Reconnect to Existing Curb Box).