20th Street Water Main Upgrades RFP
Posted
Oct 1, 2026
Oct 15, 2026
Water system improvements. The work consists of the replacement of existing cast iron water main with new PVC water main, copper service pipes, corporation and curb stops, gate valves, replacement of fire hydrants, backfilling and compaction, milling and resurfacing of the street, traffic striping, and installation of ADA-compliant curb ramps. The work also includes installation of electrical conduit crossings.

