Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
Integrated Postsecondary Education Data System identifier.
University or college mascot.
Full-time equivalent employees.
Graduation rate percentage.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Bishop State Community College
Work inlcudes installation of an owner purchased 750 kw standby generator, 2000 a / 200 a eaton automatic transfer switch, generator enclosure and concrete pad, associated electrical distribution, and all required connections to a new transformer as needed.
Posted Date
Jun 3, 2026
Due Date
Jun 30, 2026
Release: Jun 3, 2026
Bishop State Community College
Close: Jun 30, 2026
Work inlcudes installation of an owner purchased 750 kw standby generator, 2000 a / 200 a eaton automatic transfer switch, generator enclosure and concrete pad, associated electrical distribution, and all required connections to a new transformer as needed.
AvailableBishop State Community College
Provide welding equipment, gas and supplies.
Posted Date
Jun 3, 2026
Due Date
Jun 18, 2026
Release: Jun 3, 2026
Bishop State Community College
Close: Jun 18, 2026
Provide welding equipment, gas and supplies.
AvailableBishop State Community College
Consist of procuring and delivering a generator and associated electrical equipment for the information technology (IT) department. 750KW, 480/277 VAC three phase, 60 Hz, natural gas, weather protective enclosure, output circuit breakers: 2000-amp three phase and 200-amp three phase. 2000-amp, 480/277 VAC three phase, NEMA 3R, standard open transition. 200-amp, 480/277 VAC three phase, NEMA 3R, bypass isolation, open transition. 200-amp, 480/277 VAC three phase, NEMA 3R, docking station manual transfer switch with camlok style connection for portable generator. 2000-amp, 480/277 VAC, three phase, NEMA 3R, 80K AIC, 2000-amp main circuit breaker, service entrance rated, ground-fault protection of equipment, Arc flash reduction. Circuit breakers: 2000-amp three phase, 200-amp three phase. 200-amp, 480 VAC, three phase, NEMA 1 disconnect switch. 200-amp, 480/277 VAC, three phase, 22K AIC, NEMA 1, 18-space, main lugs only panel board. Circuit breakers: (1)100-amp three phase and (5)20-amp single phase. 75KVA, 480-208/120 VAC, three phase, NEMA 1. 400-amp, 208/120 VAC, three phase, 22K AIC, NEMA 1, 42-space, 250-amp main circuit breaker panel board. Circuit breakers: (2)60-amp two pole, (1)50-amp two pole, (2)30-amp two pole, (7)30-amp two pole and (9)20-amp single phase.
Posted Date
Apr 15, 2026
Due Date
May 6, 2026
Release: Apr 15, 2026
Bishop State Community College
Close: May 6, 2026
Consist of procuring and delivering a generator and associated electrical equipment for the information technology (IT) department. 750KW, 480/277 VAC three phase, 60 Hz, natural gas, weather protective enclosure, output circuit breakers: 2000-amp three phase and 200-amp three phase. 2000-amp, 480/277 VAC three phase, NEMA 3R, standard open transition. 200-amp, 480/277 VAC three phase, NEMA 3R, bypass isolation, open transition. 200-amp, 480/277 VAC three phase, NEMA 3R, docking station manual transfer switch with camlok style connection for portable generator. 2000-amp, 480/277 VAC, three phase, NEMA 3R, 80K AIC, 2000-amp main circuit breaker, service entrance rated, ground-fault protection of equipment, Arc flash reduction. Circuit breakers: 2000-amp three phase, 200-amp three phase. 200-amp, 480 VAC, three phase, NEMA 1 disconnect switch. 200-amp, 480/277 VAC, three phase, 22K AIC, NEMA 1, 18-space, main lugs only panel board. Circuit breakers: (1)100-amp three phase and (5)20-amp single phase. 75KVA, 480-208/120 VAC, three phase, NEMA 1. 400-amp, 208/120 VAC, three phase, 22K AIC, NEMA 1, 42-space, 250-amp main circuit breaker panel board. Circuit breakers: (2)60-amp two pole, (1)50-amp two pole, (2)30-amp two pole, (7)30-amp two pole and (9)20-amp single phase.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Bishop State Community College
Bishop State Community College aims to enhance student access, engagement, and retention through integrated student services. It focuses on cultivating an equitable environment for employee success and providing high-quality, industry-relevant programs. The plan also includes developing a resilient campus infrastructure and fostering community and industry partnerships to improve cultural enrichment and social equity.
The strategic plan for Bishop State Community College focuses on reviewing and updating the institutional purpose and mission to align with community and state needs. It emphasizes conducting institutional studies and program reviews to ensure academic and operational effectiveness, developing and implementing effectiveness measures to monitor progress toward strategic goals, and coordinating data gathering for long-range institutional management and annual strategic plans. The plan also promotes retention and recruitment through comprehensive planning and communication, fostering collaboration among faculty, staff, and administration to support institutional goals, and ensuring compliance with governance, regulatory, and accreditation requirements.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Bishop State Community College's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge