Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Berrien County
Work includes open channel excavation, open channel cleanout, selective clearing, riprap stabilization, stormwater pipe installation, and culvert replacements with associated road and driveway repairs. Approx quantities are as follows: approx 20,000 LF of open channel clearing or excavation; approximately 18,000 LF of selective clearing, grubbing, and snagging of open channel drain; remove and replace approximately 16 culverts totaling approx 625 LF of CMP elliptical culvert ranging in equivalent size from 15" diameter to 102" diameter; approximately 750 SY of riprap bank protection; approximately 1,225 LF of 24" RCP installation with average depth of 3-feet, including (3) 4-foot diameter manholes; remove and replace approximately 325 square yards of pavement to facilitate culvert replacements under roads.
Posted Date
Jun 17, 2026
Due Date
Jul 23, 2026
Release: Jun 17, 2026
Berrien County
Close: Jul 23, 2026
Work includes open channel excavation, open channel cleanout, selective clearing, riprap stabilization, stormwater pipe installation, and culvert replacements with associated road and driveway repairs. Approx quantities are as follows: approx 20,000 LF of open channel clearing or excavation; approximately 18,000 LF of selective clearing, grubbing, and snagging of open channel drain; remove and replace approximately 16 culverts totaling approx 625 LF of CMP elliptical culvert ranging in equivalent size from 15" diameter to 102" diameter; approximately 750 SY of riprap bank protection; approximately 1,225 LF of 24" RCP installation with average depth of 3-feet, including (3) 4-foot diameter manholes; remove and replace approximately 325 square yards of pavement to facilitate culvert replacements under roads.
AvailableBerrien County
The Berrien County GIS Department is seeking bids for the Michigan-Indiana State Line Remonumentation Project. The work involves retracement surveys of the 1827 federal survey and the recovery and remonumentation of mileposts and meander posts. Qualified bidders must be Professional Surveyors licensed in Michigan.
Posted Date
Jun 11, 2026
Due Date
Jul 15, 2026
Release: Jun 11, 2026
Berrien County
Close: Jul 15, 2026
The Berrien County GIS Department is seeking bids for the Michigan-Indiana State Line Remonumentation Project. The work involves retracement surveys of the 1827 federal survey and the recovery and remonumentation of mileposts and meander posts. Qualified bidders must be Professional Surveyors licensed in Michigan.
AvailableBerrien County
Berrien County (Purchasing) is soliciting sealed bids to develop the Berrien County Health Department 2027-2029 Strategic Plan, including community engagement, workforce development, and technology recommendations. The contract period of performance is July 15, 2026 through July 15, 2029, and work will be performed at locations within Berrien County, Michigan. Bids are due in sealed envelopes to the Purchasing Department by 09:00 AM ET on July 15, 2026.
Posted Date
Jun 8, 2026
Due Date
Jul 15, 2026
Release: Jun 8, 2026
Berrien County
Close: Jul 15, 2026
Berrien County (Purchasing) is soliciting sealed bids to develop the Berrien County Health Department 2027-2029 Strategic Plan, including community engagement, workforce development, and technology recommendations. The contract period of performance is July 15, 2026 through July 15, 2029, and work will be performed at locations within Berrien County, Michigan. Bids are due in sealed envelopes to the Purchasing Department by 09:00 AM ET on July 15, 2026.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $1,000, use sole source; otherwise bypass—go straight to a cooperative purchase to avoid formal competition.
Coops: Use OMNIA Partners, Sourcewell, or MITN; confirm with Purchasing and proceed.
Berrien County, MI.
Board meetings and strategic plans from Berrien County
The committee meeting included an update on the Area Agency on Aging, focusing on participation in state elected officials forums regarding funding priorities and advocacy. Discussions also covered federal legislative policy impacting aging services, operational challenges, organizational structure, and the increasing demand for home care services and community-based support for older adults. Additionally, administrative updates were provided regarding a juvenile center health contract resolution and a pending FOIA appeal for future board consideration.
The board reviewed several communications including tourism information and a resolution regarding critical dune areas. Key agenda items included the review of requisitions, the approval of a consent calendar encompassing various financial and administrative resolutions, such as contract amendments, grant applications, and the acceptance of donations. Additionally, an administrator report was presented and discussed, and preliminary information regarding a future strategic planning meeting and upcoming committee meeting schedules was provided.
The board conducted a review of requisitions and approved the consent calendar, which included items such as weekly bill pay, road payables, and the acceptance of a Hazardous Materials Emergency Preparedness Grant Award. The Interim County Administrator presented a report and requested input on quotes for proposed commemorative coins. The primary focus of the meeting was conducting interviews for the County Administrator position with four different candidates. Following the interviews, the board reached a consensus to invite two of the candidates back for a meet-and-greet session with department heads and elected officials, followed by a second round of interviews.
The board discussed animal control release rates, the reestablishment of a law clerk position, engineering reimbursement for the road department, and inspection services for the Glendora Road Bridge. Updates were provided regarding tax foreclosure cases and technology-related infrastructure, including potential conduit installation. Additionally, progress on the strategic planning draft was noted.
The committee discussed facility project updates, including lighting at Silver Beach, systems at the Juvenile Center, generator and leak repairs at the Jail, and various security and office upgrades. Road Department updates included ongoing pothole patching, county-wide mowing, gravel road treatments, and multiple construction and bridge replacement projects. Additionally, the committee discussed a purchase agreement, the re-activation of a sub-committee for a project, grant usage, and ongoing township discussions. Several resolutions regarding the Marine Safety Grant, correctional healthcare, and a project named Redbud were also signed.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Berrien County's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge