Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $19,000, use sole source.
Coops: Start with MiDEAL or Sourcewell. Ask procurement to confirm your contract is usable and work with the department lead to request purchase.
Barry County, MI shows a near-total absence of sole source awards. Practical note: prioritize cooperative contracts to avoid delays.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Barry County's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
County Commissioner (District 6); SWMBH Substance Use Disorder Oversight Policy Board Member
Deputy County Administrator
Chief Judge and Probate Judge, Barry County Trial Court
Drain Commissioner
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Barry County
Work consists of upgrading the internet network and Wi-Fi coverage facility wide.
Posted Date
Jan 1, 2026
Due Date
Jan 15, 2026
Release: Jan 1, 2026
Barry County
Close: Jan 15, 2026
Work consists of upgrading the internet network and Wi-Fi coverage facility wide.
AvailableBarry County
Scope of work includes, but is not limited to: 8 DIA. Steel cased well & pumping system to an estimated depth of 285ft. 190ft of cement grouting of steel casing per bechd. Well chlorination. Well development, test pumping and data review. 230v/460v 3ph, 10hp, 100 GPM stainless steel submersible pump end. New water supply plumbing to the facility. Reuse existing bladder tank. Lab water testing. On-site excavated materials disposal. Site cleanup and material handling. Adherence to miosha and environmental regulations.
Posted Date
Dec 25, 2025
Due Date
Jan 15, 2026
Release: Dec 25, 2025
Barry County
Close: Jan 15, 2026
Scope of work includes, but is not limited to: 8 DIA. Steel cased well & pumping system to an estimated depth of 285ft. 190ft of cement grouting of steel casing per bechd. Well chlorination. Well development, test pumping and data review. 230v/460v 3ph, 10hp, 100 GPM stainless steel submersible pump end. New water supply plumbing to the facility. Reuse existing bladder tank. Lab water testing. On-site excavated materials disposal. Site cleanup and material handling. Adherence to miosha and environmental regulations.
AvailableBarry County
Overhead hoist replacement. Removal of existing Hoist/Trolley. Installation of new Wire Rope Hoist/Trolley using existing bridge. Install 4th contact rail and wiring. Hoist shall have a 5-ton capacity. Minimum 24' available lift. Trolley shall be a low headroom design. 2-Speed travel and lift. Hoist shall have Overload Protection and Shock Load Prevention features. 2-speed, 3-motion radio control system in lieu of supplying a pendant station with the new hoist. Site cleanup and material handling. Adherence to MIOSHA and environmental regulations.
Posted Date
Dec 25, 2025
Due Date
Jan 15, 2026
Release: Dec 25, 2025
Barry County
Close: Jan 15, 2026
Overhead hoist replacement. Removal of existing Hoist/Trolley. Installation of new Wire Rope Hoist/Trolley using existing bridge. Install 4th contact rail and wiring. Hoist shall have a 5-ton capacity. Minimum 24' available lift. Trolley shall be a low headroom design. 2-Speed travel and lift. Hoist shall have Overload Protection and Shock Load Prevention features. 2-speed, 3-motion radio control system in lieu of supplying a pendant station with the new hoist. Site cleanup and material handling. Adherence to MIOSHA and environmental regulations.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.