City of Bandon - Ferry Creek Pump Station
Posted
Sep 4, 2026
Sep 24, 2026
The new pump station will include two non-clog submersible sewage pumps, bases, rails, wet well with lid and hatch, piles, pile cap, instrumentation, prefabricated concrete electrical building, electrical power, controls, lighting, piping, valves, fittings, flow meter, jib hoist and socket, sanitary sewer force main and related appurtenances, gravity sanitary sewer line, connections to existing pipes and structures, excavation, over excavation for structures, backfill, grading, concrete site work, retaining wall, gravel road, landscaping, and any other miscellaneous site improvements.
