FY 2026 LMIG & FY 2026 LRA Teakwood Road Widening, Deep Patching, and Temporary Stripping
Posted
Sep 3, 2026
Oct 6, 2026
Milling several deep patches, installing 2' of widening, leveling of the widened roadway, overlay of the roadway, permanent stripping, and installation of new signage.