Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
B-Y Water User District
In general, the project consists of removing and replacing existing domestic water meters with new meters and equipment compatible with automated meter reading technology. Meters are typically located in residential settings but do include agricultural, industrial, and small business settings. The project also includes replacing pressure reducing valves and dual-check valves. There are approximately 5,311 meters within the current system and are marked for replacement.
Posted Date
May 21, 2026
Due Date
Aug 5, 2026
Release: May 21, 2026
B-Y Water User District
Close: Aug 5, 2026
In general, the project consists of removing and replacing existing domestic water meters with new meters and equipment compatible with automated meter reading technology. Meters are typically located in residential settings but do include agricultural, industrial, and small business settings. The project also includes replacing pressure reducing valves and dual-check valves. There are approximately 5,311 meters within the current system and are marked for replacement.
AvailableB-Y Water User District
The project consists of the demolition of two lime slaker units in the old water treatment plant and the replacement with new equipment; the cleaning of the slaker area floor and surfaces, replacement of two pneumatic conveyance elbows on the roof of the building, and all electrical, instrumentation & controls and all other work as indicated on the drawings and as specified.
Posted Date
Jun 30, 2026
Due Date
Jul 24, 2026
Release: Jun 30, 2026
B-Y Water User District
Close: Jul 24, 2026
The project consists of the demolition of two lime slaker units in the old water treatment plant and the replacement with new equipment; the cleaning of the slaker area floor and surfaces, replacement of two pneumatic conveyance elbows on the roof of the building, and all electrical, instrumentation & controls and all other work as indicated on the drawings and as specified.
AvailableB-Y Water User District
In general, the project consists of removing and replacing existing domestic water meters with new meters and equipment compatible with automated meter reading technology. Meters are typically located in residential settings but do include agricultural, industrial, and small business settings. The project also includes replacing pressure reducing valves and dual-check valves. There are approximately 5,311 meters within the current system and are marked for replacement.
Posted Date
May 21, 2026
Due Date
Aug 5, 2026
Release: May 21, 2026
B-Y Water User District
Close: Aug 5, 2026
In general, the project consists of removing and replacing existing domestic water meters with new meters and equipment compatible with automated meter reading technology. Meters are typically located in residential settings but do include agricultural, industrial, and small business settings. The project also includes replacing pressure reducing valves and dual-check valves. There are approximately 5,311 meters within the current system and are marked for replacement.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge