Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
B-Y Water User District
Work includes removing and replacing existing domestic water meters with new meters and equipment compatible with automated meter reading technology. Meters are typically located in residential settings but do include agricultural, industrial, and small business settings. The project also includes replacing pressure reducing valves and dual-check valves. There are approximately 5,311 meters within the current system and are marked for replacement.
Posted Date
May 21, 2026
Due Date
Jun 4, 2026
Release: May 21, 2026
B-Y Water User District
Close: Jun 4, 2026
Work includes removing and replacing existing domestic water meters with new meters and equipment compatible with automated meter reading technology. Meters are typically located in residential settings but do include agricultural, industrial, and small business settings. The project also includes replacing pressure reducing valves and dual-check valves. There are approximately 5,311 meters within the current system and are marked for replacement.
AvailableB-Y Water User District
One new 2026 3/4 ton 4x4 crew cab pickups. Trade-In: 1 - 2019 Chevrolet 3/4 ton, gas, 4x4 crew cab, VIN- 1GC1KREGXKF172268 , 164,499 miles, good tires, no cracks in windshield.
Posted Date
Dec 16, 2025
Due Date
Feb 10, 2026
Release: Dec 16, 2025
B-Y Water User District
Close: Feb 10, 2026
One new 2026 3/4 ton 4x4 crew cab pickups. Trade-In: 1 - 2019 Chevrolet 3/4 ton, gas, 4x4 crew cab, VIN- 1GC1KREGXKF172268 , 164,499 miles, good tires, no cracks in windshield.
B-Y Water User District
The project generally consists of rehabilitating four ground level water storage reservoirs. Rehabilitation work includes but is not limited to cleaning, structural modifications and repairs, coating the interior and exterior, tank mixers and associated electrical work. Each of the reservoirs will have a construction window of when the tanks may be taken out of service for work to be performed.
Posted Date
Oct 14, 2025
Due Date
Nov 4, 2025
Release: Oct 14, 2025
B-Y Water User District
Close: Nov 4, 2025
The project generally consists of rehabilitating four ground level water storage reservoirs. Rehabilitation work includes but is not limited to cleaning, structural modifications and repairs, coating the interior and exterior, tank mixers and associated electrical work. Each of the reservoirs will have a construction window of when the tanks may be taken out of service for work to be performed.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge