Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Auburn Water District
The Auburn Water District seeks a contractor to perform full depth reclamation, paving, and related work for the District’s front parking lot at 75 Church Street and a 2-inch mill and overlay of the southbound lane of Southbridge Street. Bidders must meet MassDOT qualifications for Pavement - Milling and Cold Planing and Pavement Surfacing, with an estimated project value between $250,000 and $900,000. The solicitation is open for bidding until June 3, 2026.
Posted Date
May 18, 2026
Due Date
Jun 3, 2026
Release: May 18, 2026
Auburn Water District
Close: Jun 3, 2026
The Auburn Water District seeks a contractor to perform full depth reclamation, paving, and related work for the District’s front parking lot at 75 Church Street and a 2-inch mill and overlay of the southbound lane of Southbridge Street. Bidders must meet MassDOT qualifications for Pavement - Milling and Cold Planing and Pavement Surfacing, with an estimated project value between $250,000 and $900,000. The solicitation is open for bidding until June 3, 2026.
AvailableAuburn Water District
Removal & offsite disposal of backwash sludge from the three (3) iron, manganese and arsenic filtration plant backwash lagoons.
Posted Date
Jun 11, 2025
Due Date
Jul 9, 2025
Release: Jun 11, 2025
Auburn Water District
Close: Jul 9, 2025
Removal & offsite disposal of backwash sludge from the three (3) iron, manganese and arsenic filtration plant backwash lagoons.
Auburn Water District
Project includes the completion of an interconnection loop between the water district's water supply system and the city water supply systems including a pressure reducing/metering facility (excluding prefabricated building shell and exterior water mains installed by others in 2023) and approx 2,600' of 12" dia ductile iron water main with associated valves and hydrants to be installed.
Posted Date
Feb 13, 2025
Due Date
Mar 12, 2025
Release: Feb 13, 2025
Auburn Water District
Close: Mar 12, 2025
Project includes the completion of an interconnection loop between the water district's water supply system and the city water supply systems including a pressure reducing/metering facility (excluding prefabricated building shell and exterior water mains installed by others in 2023) and approx 2,600' of 12" dia ductile iron water main with associated valves and hydrants to be installed.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge