McMillan Road and McDermott Road Signal
Aug 4, 2026
Closes
Aug 19, 2026
Work includes 10 LF curb and gutter, type curb terminus; 105 LF standard 6" vertical curb & gutter; 123 SY concrete sidewalks, thickness 5"; 4 EA pedestrian ramp w/ detectable warning domes, type temporary; 3 EA pedestrian ramp w/ detectable warning domes, type sd-712a, a; 730 ton 6" minus uncrushed aggregate base; 216 CY crushed aggregate for base type i, 3/4" minus; 327 ton plant mix pavement - superpave sp-3; 1 EA inlet protection; 400 SF traffic control signs; 4 EA traffic control barricades, type ii; 200 EA portable tubular markers; 1,026 LF install traffic signal interconnect conduit (bored). See outside link.