Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Department of Veterans Affairs is soliciting bids to upgrade the campus electrical system at the VA Northern Indiana Healthcare System Fort Wayne Campus, including demolition of Building 16 and construction of a 6,600 sq ft addition to Building 1 to house primary switchgear and new generators. The project includes removal of existing equipment, installation of three new 600 kW standby generators with automatic transfer switches, and three new unit substations. The procurement is set aside for Service-Disabled Veteran-Owned Small Businesses with an estimated project magnitude of $10,000,000–$20,000,000.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide east campus electrical distribution upgrade.
Posted Date
Dec 5, 2025
Due Date
Jan 7, 2026
Release: Dec 5, 2025
Close: Jan 7, 2026
Provide east campus electrical distribution upgrade.
AvailableThis RFP is for the East Campus Electrical Distribution Upgrade project, which includes labor and materials to remove, replace, and refurbish circuit breakers and replace vacuum interrupters for six phased installations.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
This RFP is for the East Campus Electrical Distribution Upgrade project, which includes labor and materials to remove, replace, and refurbish circuit breakers and replace vacuum interrupters for six phased installations.
AvailableThis project generally consists of replacing the existing primary metered electrical distribution system and replacing it with a new secondary metered electrical distribution system.
Posted Date
Dec 2, 2025
Due Date
Dec 22, 2025
Release: Dec 2, 2025
Close: Dec 22, 2025
This project generally consists of replacing the existing primary metered electrical distribution system and replacing it with a new secondary metered electrical distribution system.
AvailableThe Department of Veterans Affairs (Veterans Health Administration, VISN 6) is soliciting bids for the Upgrade HVAC System Phase II project at the Salem VA Medical Center. This Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside involves the demolition and replacement of five existing air handling units (AHUs) and associated systems in Building 143 with three new custom AHUs, VAV terminal units, exhaust fans, piping, ductwork, and Siemens Desigo controls. The work must comply with VA, NFPA, and federal building codes, with an estimated project value between $5M and $10M and a 365-calendar day performance period. Key dates include a pre-bid conference on December 11, 2025, at 09:30 AM EST, an RFI cutoff on December 18, 2025, at 02:00 PM EST, and electronic bids due on January 6, 2026, at 05:00 PM EST.
Posted Date
Dec 1, 2025
Due Date
Jan 7, 2026
Release: Dec 1, 2025
Close: Jan 7, 2026
The Department of Veterans Affairs (Veterans Health Administration, VISN 6) is soliciting bids for the Upgrade HVAC System Phase II project at the Salem VA Medical Center. This Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside involves the demolition and replacement of five existing air handling units (AHUs) and associated systems in Building 143 with three new custom AHUs, VAV terminal units, exhaust fans, piping, ductwork, and Siemens Desigo controls. The work must comply with VA, NFPA, and federal building codes, with an estimated project value between $5M and $10M and a 365-calendar day performance period. Key dates include a pre-bid conference on December 11, 2025, at 09:30 AM EST, an RFI cutoff on December 18, 2025, at 02:00 PM EST, and electronic bids due on January 6, 2026, at 05:00 PM EST.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis