Closed

YVC - Hopf Union Building (HUB) Roof, Yakima, WA

Description: Work includes consists of a roof recover to the existing hopf union building. Work includes roof preparation, roof recover over existing sbs-modified membrane over rigid roof insulation, with new tpo roof membrane and replacement of metal roof flashings. Replacement of existing asphalt shingles with new asphalt shingles (base bid). Replacement of existing asphalt shingles with preformed metal roofing (alternate bid). Division 2: site work; division 7: thermal & moisture protection - asphalt shingles; preparation for reroofing; single ply membrane roofing; preformed metal roofing; flashing and sheet metal.

Released
Jun 11, 2026
Closes
Jul 9, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts