Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Yuma County Library District
Rooftop-Mounted Packaged Air Conditioning Units: Selected contractor will remove and transport to County’s designated storage area seven (7) rooftop-mounted packaged air conditioning units, and provide and install seven (7) new rooftop-mounted packaged air conditioning units with accessories as shown on plans. Zone Damper Controllers: Selected contractor will remove and transport to County’s designated storage area the existing controls in each existing zone damper, and provide and install new controls at each existing zone damper. The new controls will include actuator and airflow measurement or velocity sensor to allow for pressure-independent control. Exhaust Fans: Selected contractor will remove and transport to County’s designated storage area two (2) rooftop-mounted exhaust fans and install two (2) new rooftop-mounted downblast exhaust fans with accessories as shown on plans. Split-System: Selected contractor will remove and transport to County’s designated storage area nine (9) Split System AC units, and provide and install a variable refrigerant flow (VRF) system comprised of twelve indoor fan coil units and five outdoor condensing units. The new system will also include one new intake fan. Units are to either be heat pumps, or come equipped with electric heat strips. Contractor to provide/install curb adaptors as necessary. Convenience outlets and non-fused disconnects to be provided at each unit. Contractor to make all necessary electrical connections (460 volt/3 phase) to each unit.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
University of Michigan Ann Arbor
Work includes replacing perimeter heat and ac units.
Posted Date
Nov 7, 2025
Due Date
Dec 5, 2025
Release: Nov 7, 2025
University of Michigan Ann Arbor
Close: Dec 5, 2025
Work includes replacing perimeter heat and ac units.
AvailableMassachusetts Department of Youth Services
The Massachusetts Department of Youth Services solicits sealed bids for replacement of the roof and rooftop units at the DYS Paul T. Leahy facility in Worcester, MA, including installation of new roofing and rooftop units and removal of existing equipment. A pre-bid conference and site walk-through are scheduled for November 5, 2025, and the overall solicitation close date is December 4, 2025, with earlier sub-bid and general contractor due dates noted on the listing.
Posted Date
Oct 22, 2025
Due Date
Dec 4, 2025
Release: Oct 22, 2025
Massachusetts Department of Youth Services
Close: Dec 4, 2025
The Massachusetts Department of Youth Services solicits sealed bids for replacement of the roof and rooftop units at the DYS Paul T. Leahy facility in Worcester, MA, including installation of new roofing and rooftop units and removal of existing equipment. A pre-bid conference and site walk-through are scheduled for November 5, 2025, and the overall solicitation close date is December 4, 2025, with earlier sub-bid and general contractor due dates noted on the listing.
AvailableVillage of North Palm Beach
The Village of North Palm Beach is soliciting proposals to replace existing HVAC units at the North Palm Beach Library using construction plans prepared by REG Architects dated 10/23/2025. A mandatory pre-bid meeting was scheduled for November 18, 2025 and proposals are due December 15, 2025.
Posted Date
Nov 7, 2025
Due Date
Dec 15, 2025
Release: Nov 7, 2025
Village of North Palm Beach
Close: Dec 15, 2025
The Village of North Palm Beach is soliciting proposals to replace existing HVAC units at the North Palm Beach Library using construction plans prepared by REG Architects dated 10/23/2025. A mandatory pre-bid meeting was scheduled for November 18, 2025 and proposals are due December 15, 2025.
AvailableCity of Madison
Library Service + Support - Siding Replacement.
Posted Date
May 8, 2024
Due Date
Dec 18, 2025
Release: May 8, 2024
City of Madison
Close: Dec 18, 2025
Library Service + Support - Siding Replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis