Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of 134 LF of install 12" PVC water pipe, 5,415 LF of install 8" PVC water pipe, 2 EA of install 12" water gate valve assembly, 15 EA of install 8" water gate valve assembly, 3 EA of install 1" combination air release valve assembly, 60 EA of install 1" water service, 9 EA of install fire hydrant assembly, 5 EA of remove existing fire hydrant, 22 EA of abandon valve box , 4 ea of install 8" utility under crossing, 1 EA of install 8" utility shallow over crossing, 26 EA of adjust water valve to grade, 23,300 SF of install ac pavement, 2,110 SF of remove existing & construct cross gutter, 100 LF of street lighting conduit and wiring repair.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
Water Main Replacement, includes replacing water mains downstream of the new 1 MG water storage tank. The Water Main Replacement
AvailableLouisville Water Company is inviting bids for the Hazelwood Avenue Area Water Main Replacement Project in Louisville, Kentucky. The solicitation covers replacement of water mains within the Hazelwood Avenue area; all bid documents and details are provided through the Louisville Water Company Digital Planroom. Bids are due by 11:00 AM Eastern Time on February 18, 2026.
Posted Date
-
Due Date
Feb 18, 2026
Close: Feb 18, 2026
Louisville Water Company is inviting bids for the Hazelwood Avenue Area Water Main Replacement Project in Louisville, Kentucky. The solicitation covers replacement of water mains within the Hazelwood Avenue area; all bid documents and details are provided through the Louisville Water Company Digital Planroom. Bids are due by 11:00 AM Eastern Time on February 18, 2026.
Replacement of approx. 652 LF of water main and all associated appurtenances.
Posted Date
Jan 6, 2026
Due Date
Feb 3, 2026
Release: Jan 6, 2026
Close: Feb 3, 2026
Replacement of approx. 652 LF of water main and all associated appurtenances.
AvailableWork consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.
Posted Date
Dec 23, 2025
Due Date
Feb 4, 2026
Release: Dec 23, 2025
Close: Feb 4, 2026
Work consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis