Closing soon

Yonkers Nepperhan Pedestrian Bridge Repairs RFP

Description: Work includes approx 12 LF of drainage structure inlet protection, prefab, temporary; 100 LF of 12" sediment filter log-temporary; 242 LF of crack repair by epoxy injection; 5,800 SF of protective sealing of existing structural concrete and existing bridge decks; 65 SF of repair stone masonry; 671 LF of pedestrian railing ricket style; 54 SF structural steel painting: localized; 242 SF of removal of structural concrete-replacement with vertical and overhead patching material; 450 LF of remove existing chain-link fence; 66 SF of 8" concrete sidewalk (All work included).

Buyer
Released
Aug 4, 2026
Closes
Aug 21, 2026(11 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts