FederalOK
Aug 7, 2026
Closes
Sep 14, 2026
WWYK240052 Renovate Hallway, 1AB1-103C, 1AB1-108B, B3001 RFP
Tthe renovation of hallways.
Description: Renovate Chilled Water Circuit 3, B3001. This is a Concept Design. Recommendations #13 para 5a on pgs 11-12 and #14 para 5.b on pg 12 of the Chilled Water Distribution Study by ZRHD on 5 Oct 2020. Circuit #3: remove old Circuit #3 piping to multiple fan decks and re-feed from new Circuit #3. Remove reverse return piping and connect to the new Circuit #3. Replace 2" supply and return to AHU's PR65 and PR66 with 4" supply and return piping. Eliminate tertiary pumps CHWP-PR65 and CHWP-PR66. Relocate from over workspaces and mezzanines to the best located aisle for ease of access and maintenance. The work to be performed under the terms of this Order consists of furnishing all design/engineering services, materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the removal of the existing Chilled Water Circuit #3 piping that extends to multiple fan decks. The work will also consist of installing a new Circuit #3, relocating the piping away from workspaces and mezzanines to the east aisle way when possible, for ease of access and maintenance and demolition of old steam lines at AFB.
Federal · OK, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Procurement and program contacts connected to Air Force Sustainment Center.
These related opportunities are still open for bidding.
FederalOK
Aug 7, 2026
Closes
Sep 14, 2026
Tthe renovation of hallways.
Jul 21, 2026
Closes
Sep 8, 2026
Provide chilled water from the building 31 primary chiller to serve Buildings 42 and 43, bypassing the existing chillers in 42 and 43 during normal operation. Normal Operation (Primary from Building 31): Building 42 and Building 43 are served directly from building 31 chilled-water plant. The existing chillers for 42 and 43 are isolated and not in use. Valves and actuators shall be connected to the Building Management System (BMS) and automatically controlled for mode selection. See attached file.
FederalOK
May 14, 2026
Closes
Sep 11, 2026
The work to be performed under the terms of this Order consists of furnishing all design/engineering services, materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair due to a previous flood in the space this project will encompass a complete interior renovation of the existing 2nd floor space. The elevated platform level is located within B3001 adjacent to post WX 107 110 at TAFB.
School DistrictMI
-
Closes
Sep 16, 2026
The Anchor Bay School District is soliciting sealed bids for chillers, chilled-water pumps, and rooftop unit equipment for HVAC upgrades at multiple district schools. The work includes supplying, delivering, installing, testing, and commissioning the equipment, along with a bid security of at least 2.5% and required compliance certifications. Bids are due and scheduled for public opening on September 16, 2026; the procurement is an Invitation for Bid rather than a grant program.