FederalOK
Aug 3, 2026
Closes
Sep 10, 2026
TINKER AFB MAC BOA WWYK250131 Replace Ridge Cap on Hangar Roof, B824
Repair by replacement of ridge cap at project loaction b824.
Description: The work to be performed under the terms of this Order consists of furnishing all design/engineering services, materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair due to a previous flood in the space this project will encompass a complete interior renovation of the existing 2nd floor space. The elevated platform level is located within B3001 adjacent to post WX 107 110 at TAFB.
Federal · OK, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Procurement and program contacts connected to Air Force Sustainment Center.
Adjacent opportunities open for bidding right now.
FederalOK
Aug 3, 2026
Closes
Sep 10, 2026
Repair by replacement of ridge cap at project loaction b824.
FederalOK
Jul 22, 2026
Closes
Sep 1, 2026
This project is required to safely decommission and remove 2 obsolete computer room air conditioning (CRAC) units from a data center facility. The removal of this equipment necessitates the architectural, mechanical, electrical, and structural restoration of the floor, wall, and ceiling systems to return the space to a safe, clean, and fully operational condition.
FederalOK
Jul 22, 2026
Closes
Aug 31, 2026
Accomplish the demo and replacement of the industrial waste lift stations (IWLS) 6N and 6S. Work includes removing the existing stations, installing new lift station equipment and valve vaults, and connecting them to the existing industrial waste system. Mechanical upgrades include a new wet well, new submersible pumps, containment piping, and improved screening to manage future flows, and maintenance needs. Site grading and drainage improvements will support the new installation. Electrical upgrades will include new controls, power improvements, and integration with the base monitoring system. Construction will be sequenced to keep one lift station in service at all times and minimize disruptions.
FederalOK
Aug 7, 2026
Closes
Sep 14, 2026
Tthe renovation of hallways.