CityMI
Posted
Aug 19, 2026
Sep 14, 2026
Roof Replacement Phase 2 Haskell Community Center (Request for Proposal)
Work consists Remove existing roofing system and components down the structural decking; Mechanically fasten two layers of 2.6" polyisocyanurate insulation, staggering joints throughout; Install wood nailer at perimeter to meet new roof line at fastener pattern provided; Install 1/4:12 tapered polyisocyanurate insulation on roofing sections without structural slope; Install 1/2:12 slope tapered saddles between drain sumps.