Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide project design and engineering services for the wwtp primary and secondary clarifier refurbishment project. Perform project management including scheduling, planning, quality control, coordination meetings, and invoice review. Review the energy use looking cost-effective energy savings. Summarize findings in a report to meet department of ecology requirements. Develop base map showing right-of-way lines, surface features, structures, and above & below-grade utilities. Develop preliminary design for coordination and review with city. Develop plans, specifications, and estimates for city review and deliver final 100% construction package. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeks for primary clarifier improvements - center feed clarifier equipment procurement.
Posted Date
-
Due Date
Dec 23, 2025
Close: Dec 23, 2025
Seeks for primary clarifier improvements - center feed clarifier equipment procurement.
AvailableWork includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Work includes demolition of existing secondary clarifiers no. 3 and 4 and piping as shown on contract drawings; provide and install all erosion control measures as shown in the contract drawings; excavation, backfilling, and restoration; construction of two new, cast-in-place concrete, 60-ft diameter secondary clarifier tanks. Clarifier tank components to include, but not limited to, new 304ss mechanism, control panel, center unit drive, and frp baffles and weirs; provide new 16" clarifier influent, 14" clarifier effluent, 8" sludge, and 6" scum and 6" drain below grade piping between the new clarifier and existing tie-in locations as indicated on contract drawings; provide new 8" ras and 6" was below grade piping per contract drawings;
Seeking proposals from qualified persons, firms, partnerships, corporations, associations, or professional organizations to provide constructability review, value engineering, master scheduling, cost estimating, budgeting, and construction services for the development and construction for the pya expansion classroom building project. Scope includes the construction of a new classroom building, parking lot expansion, and other associated site work.
Posted Date
Dec 2, 2025
Due Date
Jan 27, 2026
Release: Dec 2, 2025
Close: Jan 27, 2026
Seeking proposals from qualified persons, firms, partnerships, corporations, associations, or professional organizations to provide constructability review, value engineering, master scheduling, cost estimating, budgeting, and construction services for the development and construction for the pya expansion classroom building project. Scope includes the construction of a new classroom building, parking lot expansion, and other associated site work.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis