Ralls County Public Water Supply District 1
Special DistrictMO
Posted
-
Dec 8, 2026
Norwoods WWTF Improvements - Ralls County PWSD No. 1 RFP
Work includes rerouting of existing sand filter lift station to a proposed low pressure pipe (lpp) system with 3000 gal. Dosing tank and 5000 gal. Septic tank by way of proposed 2" pvc force main. Both existing lift station pumps are to be removed and replaced. Pump controls shall be accomplished via proposed control panel. Existing mission cellular scada unit shall be reused. Proposed 16" wide access road shall be constructed to allow for vactor truck access to proposed 5000 gal. Septic tank and 3000 gal. Dosing tank. System is designed for 4,000 gallons of daily flow and 8,640 gallons of peak capacity.
