CountyOK
Posted
Nov 19, 2026
Dec 7, 2026
Erosion Prevention Block Mats RFP
Erosion Prevention Block Mats.
Description: The goal of this Project is to provide permanent erosion repair and prevent future erosion of the existing Recycled Water (RW) Pond at the Western Water Recycling Facility (WWRF). The WWRF current average daily wastewater flow is around 1.5 MGD. Tertiary effluent from the plant is discharged to the recycled water storage pond. When the flow of recycled water exceeds irrigation demands, the excess treated water is stored in the existing pond until demand increases. The current storage pond capacity is 35 million gallons (MG). The project is divided into two phases. This first phase includes the improvements in the vicinity of the existing secondary effluent equalization basins. The Engineer's opinion of probable cost are the following: Base Bid: $1,330,000, Additive Bid $330,000, Base and Additive Bid: $1.660,000. The second phase will be addressed seeparately and is not part of this project. The recycled water is used for irrigation purposes and via irrigation pump stations is pumped to either: · The General Old Golf Course (GC) and the Riverside National Cemetery (RNC) via an existing irrigation pump station (RNC&GC PS). This pump station is equipped with two pumps, each with a capacity of 850 gallon per minute (gpm), and operates based on pressure drop. The field results indicate that the station’s overall capability is believed to be 1,100 gpm (1.58 mgd. RNC is the largest single user of recycled/non-potable water. · Western’s recycled/ non-potable water pump station system (RW/NPW PS) pumps into the U-2 system and operates based on the level of the Lurin Irrigation Tank (0.3 MG). This station is equipped with four pumps, each capable of 1,160 gpm. The station’s total capacity is believed to be 4,400 gpm (6.33 mgd).
SpecialDistrict · CA, US
Adjacent opportunities open for bidding right now.
CountyOK
Posted
Nov 19, 2026
Dec 7, 2026
Erosion Prevention Block Mats.
CityMS
Posted
-
Dec 7, 2026
Work includes drainage improvements to stabilize the existing ditch channel with riprap and to protect the existing city utilities.
Wisconsin Department of Administration
State AgencyWI
Posted
Nov 5, 2026
Dec 10, 2026
In general, the work consists of: Replacing and improving the existing sidewalk immediately south of Stratton Hall and adjacent hillside through implementation of surface erosion control measures, including additional sidewalk support and modifications to improve drainage and reduce erosion impacts. The project also includes replacement of the pedestrian ramp sidewalk and installation of a detectable warning field, handrail improvements consisting of replacement of the railing adjacent to Stratton Hall, and spot repairs to the existing retaining wall as budget allows.
Gateway Services Community Development District
Special DistrictFL
Posted
Nov 14, 2026
Dec 30, 2026
Work includes restoration of approximately 5,430 lf of shoreline for pond 21, placement of geotextile fabric and lime rock base/fill mix, graded to a 4:1 slope. Sodding and restoration of any disturbed irrigation or staging areas. Dewatering if needed (with approval) and verification of existing stormwater infrastructure.
Decision makers connected to this RFP from Western Mun Water Dist Of Riverside.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
546 days before RFP
Western Water's Board approved a $550,000 project budget and awarded Lee and Row Incorporated a $449,315 design contract for phased stabilization of erosion and slope failures around its recycled-water ponds.
Okay, we'll move on to item D. Approve a project budget and award a professional services contract to Lee and Row Incorporated for the Western Water Recycling Facility Recycled Water Pond Erosion Prevention Project. Mr. Miller, there's got to be a good acronym in there somewhere. Uh Derek's here. This this went through that actually uh all of these items…
Western Water Regular Board Meeting
Board meeting · May 21, 2025
Board meeting
198 days before RFP
Western Water's Capital Improvement Program listed recycled water pond erosion repairs at WWRF among projects in design.
• Meridian Building HVAC Upgrades • Recycled Water Pond Erosion Repairs at Western Water Recycling Facility (WWRF) • Madison Avenue (Murrieta) Water and Sewer Pipelines • PFAS-Focused Sewer Rehabilitation at March Air Reserve Base (MARB) • Chlorine Contact Chamber Covers at WWRF • Waterline Relocations at the Mockingbird Wash (Flood Control Project)…
Western Municipal Water District Committee Meeting
Board meeting · May 4, 2026
Agenda packet
168 days before RFP
Resolution 3378's project listing included $1,400,000 for the Western Water Recycling Facility Pond Erosion Prevention Project.
RESOLUTION 3378 RESOLUTION OF THE BOARD OF DIRECTORS OF WESTERN MUNICIPAL WATER DISTRICT OF RIVERSIDE COUNTY APPROVING THE GENERAL MANAGER'S OPERATING AND CAPITAL BUDGET FOR FISCAL YEARS 2026- 2027 AND 2027-2028 WHEREAS, Western Water reports its activities as an enterprise fund, which is used to account for operations that are financed and operated in a…
RFP published
Proposals due (21 days left)
Western Municipal Water District Regular Board Meeting
Agenda packet · Jun 3, 2026