Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Western Mun Water Dist Of Riverside
Western Municipal Water District is soliciting quotes to replace six vault lids and top concrete rings at the Holcomb Pump Station located at 500 E Alessandro Blvd, Riverside, CA. Work includes removal and disposal of existing lids and rings, sawcutting and paving two feet of asphalt around each lid, and furnishing pre-cast concrete rings and aluminum H-20-rated lids with spring-assisted levers; required contractor license classes are listed on the posting. This RFQ (RFQ-OPS25-022R) was posted 07/16/2026 and responses are due 08/17/2026 at 3:00 PM PDT via the agency's PlanetBids vendor portal.
Posted Date
Jul 16, 2026
Due Date
Aug 17, 2026
Release: Jul 16, 2026
Western Mun Water Dist Of Riverside
Close: Aug 17, 2026
Western Municipal Water District is soliciting quotes to replace six vault lids and top concrete rings at the Holcomb Pump Station located at 500 E Alessandro Blvd, Riverside, CA. Work includes removal and disposal of existing lids and rings, sawcutting and paving two feet of asphalt around each lid, and furnishing pre-cast concrete rings and aluminum H-20-rated lids with spring-assisted levers; required contractor license classes are listed on the posting. This RFQ (RFQ-OPS25-022R) was posted 07/16/2026 and responses are due 08/17/2026 at 3:00 PM PDT via the agency's PlanetBids vendor portal.
AvailableWestern Mun Water Dist Of Riverside
Western Municipal Water District (WMWD) is soliciting competitive bids for Specification No. W-342, the Turf Replacement at Bergamont Park Project located at 19275 Bergamont Drive, Riverside, CA. The selected contractor will remove approximately 8,860 square feet of existing non-functional turf and surrounding hardscape around the District-owned Bergamont Pump Station and replace it with a water-wise, drought-tolerant landscape featuring new drip irrigation, hardscape elements, and site furnishings. Work must be performed by a California Class C-27 Landscaping licensed contractor registered with the Department of Industrial Relations, with prevailing-wage compliance and a 100% performance bond required.
Posted Date
Jun 29, 2026
Due Date
Jul 31, 2026
Release: Jun 29, 2026
Western Mun Water Dist Of Riverside
Close: Jul 31, 2026
Western Municipal Water District (WMWD) is soliciting competitive bids for Specification No. W-342, the Turf Replacement at Bergamont Park Project located at 19275 Bergamont Drive, Riverside, CA. The selected contractor will remove approximately 8,860 square feet of existing non-functional turf and surrounding hardscape around the District-owned Bergamont Pump Station and replace it with a water-wise, drought-tolerant landscape featuring new drip irrigation, hardscape elements, and site furnishings. Work must be performed by a California Class C-27 Landscaping licensed contractor registered with the Department of Industrial Relations, with prevailing-wage compliance and a 100% performance bond required.
AvailableWestern Mun Water Dist Of Riverside
Western Municipal Water District (WMWD) is soliciting competitive bids for Specification No. W-342, the Turf Replacement at Bergamont Park Project located at 19275 Bergamont Drive, Riverside, CA. The selected contractor will remove approximately 8,860 square feet of existing non-functional turf and surrounding hardscape around the District-owned Bergamont Pump Station and replace it with a water-wise, drought-tolerant landscape featuring new drip irrigation, hardscape elements, and site furnishings. Work must be performed by a California Class C-27 Landscaping licensed contractor registered with the Department of Industrial Relations, with prevailing-wage compliance and a 100% performance bond required.
Posted Date
Jun 29, 2026
Due Date
Jul 31, 2026
Release: Jun 29, 2026
Western Mun Water Dist Of Riverside
Close: Jul 31, 2026
Western Municipal Water District (WMWD) is soliciting competitive bids for Specification No. W-342, the Turf Replacement at Bergamont Park Project located at 19275 Bergamont Drive, Riverside, CA. The selected contractor will remove approximately 8,860 square feet of existing non-functional turf and surrounding hardscape around the District-owned Bergamont Pump Station and replace it with a water-wise, drought-tolerant landscape featuring new drip irrigation, hardscape elements, and site furnishings. Work must be performed by a California Class C-27 Landscaping licensed contractor registered with the Department of Industrial Relations, with prevailing-wage compliance and a 100% performance bond required.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Western Mun Water Dist Of Riverside
The board meeting featured the graduation ceremony for the 2026 Western Water Leaders cohort and the approval of the consent calendar. The board focused on authorizing the General Manager to execute exchange water purchase agreements with partner agencies. Key discussion points included the background of these negotiations, which aim to resolve previous legal conflicts and enhance regional water security. The agreement outlines a baseline supply of 10,000 acre-feet per year and a one-time pre-purchase of 30,000 acre-feet to serve as a contingency against future droughts and shortages.
The board meeting included a presentation on current water supply conditions, detailing statewide project allocations, Colorado River challenges, and storage management strategies. The board also discussed and received updates on major projects, including the Delta Conveyance project, the Sites Reservoir, and potential new reservoir studies. Additionally, a public hearing was held regarding the adoption of water and sewer availability charges for the Murrieta service area for the upcoming fiscal year, with the board approving the maintenance of existing rates.
The committee meeting addressed several professional services and operational agreements, including the approval of a project budget for a water supply alternatives study in the Rainbow Service Area and the renewal of a uniform rental services agreement with Cintas Corporation. Furthermore, the committee recommended the adoption of the 2025 Urban Water Management Plan and the 2025 Water Shortage Contingency Plan to the full Board of Directors. Discussions also included logistical feedback regarding the formatting of meeting agendas and presentation materials.
The board meeting included a presentation by the Keep Riverside Clean and Beautiful organization recognizing an employee as the Volunteer of the Year. The Board approved the consent calendar and authorized adding an item to the agenda concerning a time-sensitive financial matter. Discussions were held regarding the adoption of updated investment policies for fiscal year 2026-2027 and the ratification of the Western Riverside County Regional Wastewater Authority budget. Additionally, the Board reviewed proposed water rates and charges for wholesale agencies for calendar year 2027, including adjustments based on Metropolitan Water District's new business model which introduces fixed capacity charges.
The committee reviewed and recommended items to the full Board of Directors, including the adoption of rates and conditions for the disposal of non-reclaimable wastewater into the Inland Empire Brine Line and pretreatment compliance fees for the 2026-2027 fiscal year. Additionally, the committee discussed the adoption of budgets and the levy of special taxes for Community Facilities Districts, received cash disbursement reports, and reviewed operating budget reports. The committee also received reports from the General Manager and the Assistant General Manager/Chief Financial Officer regarding water agreements and deliveries.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Western Mun Water Dist Of Riverside's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Assistant General Manager - Chief Financial Officer
Assistant General Manager – Communications and Customer Experience
Premium
Access the largest public sector contact database
© 2026 Starbridge